A. Subgrade construction. The entire surface of the in-place subgrade shall be plowed, harrowed and mixed to a depth of at least six inches. After the material has been thoroughly mixed, the subgrade shall be brought to plan line and grade and compacted to 100 percent of the maximum laboratory dry density unless the subgrade is to be stabilized, in which case the density requirement will not apply at this stage; or unless a subsequent Contract provides for base construction. In the latter case, mixing will be eliminated and the in-place subgrade compacted to 95 percent of the laboratory maximum dry density. Prior to placing any subsequent layers of base and paving materials, the subgrade shall have sufficient stability to support construction equipment without excessive movement regardless of compaction. Areas of subgrade that are unstable shall be reworked to a moisture content that will provide stability and compaction. The surface of the completed Subgrade shall be bladed to a smooth and uniform texture. The centerline profile shall conform to the established elevations with an acceptable tolerance of +- 1/2 inch. The acceptable tolerance under a template conforming to the designated cross-section shall be +- 1/4 inch. The maximum dry density and the test methods shall be in accordance with section 6.03 A. Sec. 7. Graded aggregate base.