--- title: Dacula Zoning Ordinance, Section 1301. Building Permit Required collection: local-codes id: local-code:dacula/zoning/1301 cite_as: Dacula, Ga., Zoning Ordinance ยง 1301 canonical_url: https://georgiacommons.org/code/local/dacula/zoning/1301 md_url: https://georgiacommons.org/code/local/dacula/zoning/1301.md text_url: https://georgiacommons.org/code/local/dacula/zoning/1301/text source_url: https://www.daculaga.gov/DocumentCenter/View/522 date: 2026-11-25 status: active jurisdiction: city:dacula jurisdiction_name: Dacula place_fips: "1321184" corpus_version: local-codes-dacula-edce41ff9e00 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/dacula/zoning/~article-xiii.md previous: https://georgiacommons.org/code/local/dacula/zoning/1300.md next: https://georgiacommons.org/code/local/dacula/zoning/1302.md index: https://georgiacommons.org/code/local/dacula.md branch: zoning edition: As posted on the city's website, retrieved 2026-11-25 edition_date_kind: retrieved source_publisher: city website version_id: local-code:dacula/zoning/1301@2026-11-14-a32f267d6e --- # Dacula Zoning Ordinance, Section 1301. Building Permit Required > As posted on the city's website, retrieved 2026-11-25 Part of: Article XIII - ADMINISTRATION, ENFORCEMENT, PENALTIES AND REMEDIES No building or other structure shall be erected, moved, added to or structurally altered without a Building Permit issued by the City Administrator or his/her designee. No Building Permit shall be issued except in conformance with the provisions of this Resolution and the current building code. Building permit placards issued by the City shall be kept onsite in a visible location. Building permits shall be valid for no longer than 12-months after the date of issuance. One or more extensions of time, for periods not more than 90 days each, may be allowed for the permit. The extension must be requested in writing prior to the expiration of the existing permit and justifiable cause must be demonstrated. Extensions that are granted must be in writing by the City Administrator or his / her designee. The permit may be re-issued only upon completion of the application procedure outlined in Sections 1303 of this Resolution. All applications for Land Disturbance Permits, and Building Permits for uses other than one-family and duplex dwellings shall be accompanied by plans, drawn to scale, showing the actual dimensions of the lot to be built upon, the sizes and the locations on the lot of any existing buildings or structures, the shape, size, height, use and the location on the lot of the building or structure to be erected, moved, added to or structurally altered and such other information as may be necessary to provide for the enforcement of this Resolution. These applications and plans shall conform to the requirements of the Development Regulations of the City of Dacula.