--- title: Dacula Zoning Ordinance, Section 1805. Watershed Protection District Stream Buffers and Setbacks collection: local-codes id: local-code:dacula/zoning/1805 cite_as: Dacula, Ga., Zoning Ordinance ยง 1805 canonical_url: https://georgiacommons.org/code/local/dacula/zoning/1805 md_url: https://georgiacommons.org/code/local/dacula/zoning/1805.md text_url: https://georgiacommons.org/code/local/dacula/zoning/1805/text source_url: https://www.daculaga.gov/DocumentCenter/View/508 date: 2026-11-25 status: active jurisdiction: city:dacula jurisdiction_name: Dacula place_fips: "1321184" corpus_version: local-codes-dacula-edce41ff9e00 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/dacula/zoning/~article-xviii.md previous: https://georgiacommons.org/code/local/dacula/zoning/1804.md next: https://georgiacommons.org/code/local/dacula/zoning/1806.md index: https://georgiacommons.org/code/local/dacula.md branch: zoning edition: As posted on the city's website, retrieved 2026-11-25 edition_date_kind: retrieved source_publisher: city website version_id: local-code:dacula/zoning/1805@2026-11-14-e9cea9e1ab --- # Dacula Zoning Ordinance, Section 1805. Watershed Protection District Stream Buffers and Setbacks > As posted on the city's website, retrieved 2026-11-25 Part of: Article XVIII - WATERSHED PROTECTION DISTRICTS 1. Stream Buffer: a. For all perennial streams beyond a seven (7) mile radius of a water supply intake, a buffer must be maintained for a distance of fifty (50) feet on both sides of the stream as measured from the stream banks. 1) Notwithstanding any other provisions of this section, forestry practices limited to the thinning and harvesting of timber in accordance with a forest management plan that incorporates best management practices approved by the Georgia Forestry Commission must be permitted in the buffer areas. 2) Notwithstanding any other provisions of this section, the continued cultivation of agricultural crops and the occasional pasturing of livestock shall be permitted within the buffer area, provided that the best management practices of the Georgia Department of Agriculture are followed. 3) Buffer requirements shall not apply adjacent to the dam side of detention facilities. 2. Stream setbacks: For all perennial streams beyond a seven-mile radius of a water supply intake, no impervious surface must be constructed within a seventy-five (75) foot setback area on both sides of the stream as measured from the stream banks. Stream setback requirements shall not apply adjacent to the dam side of detention facilities. 3. Septic tank drainfield restrictions: For all perennial streams beyond a seven-mile radius of a water supply intake, septic tanks and septic tank drainfields are prohibited within seventy-five (75) feet on both sides of the stream as measured from the stream banks. 4. Water and wastewater utilities: a. Utilities shall be exempt from the above buffer and setback provisions in accordance with the following conditions, if the utilities to be located in the buffer or setback areas cannot feasibly be located outside these areas: b. The utilities shall be located as far from the stream bank as reasonably possible. c. The installation and maintenance of the utilities shall be such as to protect the integrity of the buffer and setback areas as best as reasonably possible. 5. Roadways, bridges and drainage structures. Roadways, bridges and drainage structures may encroach upon required buffers and setbacks where such structures are necessary to provide access. Such roadways and bridges shall cross streams perpendicularly where reasonably possible. The number of such stream crossings and associated structures shall be minimized to the greatest extent possible. 6. Lots of record. All lots or parcels of record as of the effective date of this amendment and all lots or parcels which have been submitted by way of preliminary plat and approved by the City in accordance with the provisions of the Zoning Resolution of the City of Dacula, as of the effective date of this amendment, within the Alcovy and the Apalachee Watersheds, that are made unbuildable by the buffer and setback provisions, may still be developed on a case-by-case basis. Requests for development of these lots shall be made to the City Clerk as administrative variances. If development is allowed, the maximum possible impervious surface setback and stream buffer width, given the configuration of the lot, shall be maintained.