Section 704. Temporary Buildings.

About this text

  • As posted on the city's website, retrieved 2026-11-25

A temporary building or buildings for use in connection with a construction project or land subdivision development shall be required to acquire a temporary permit for a period of six (6) months. If the temporary building or buildings is needed for a period beyond six (6) months, reapplication may be made at the end of the six (6) month period.