--- title: Dallas Zoning Ordinance, Sec. 44-25. Application for building permit collection: local-codes id: local-code:dallas/zoning/44-25 cite_as: Dallas, Ga., Zoning Ordinance ยง 44-25 canonical_url: https://georgiacommons.org/code/local/dallas/zoning/44-25 md_url: https://georgiacommons.org/code/local/dallas/zoning/44-25.md text_url: https://georgiacommons.org/code/local/dallas/zoning/44-25/text source_url: https://library.municode.com/ga/dallas/codes/code_of_ordinances date: 2026-11-11 status: active jurisdiction: city:dallas jurisdiction_name: Dallas place_fips: "1321324" corpus_version: local-codes-dallas-50f39a35e05c publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/dallas/zoning/~part-ii/~chapter-44/~article-ii/~division-1.md previous: https://georgiacommons.org/code/local/dallas/zoning/44-24.md next: https://georgiacommons.org/code/local/dallas/zoning/44-26.md index: https://georgiacommons.org/code/local/dallas.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:dallas/zoning/44-25@2026-11-11-3ac02c2867 --- # Dallas Zoning Ordinance, Sec. 44-25. Application for building permit > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - THE CODE OF ORDINANCES / Chapter 44 - ZONING / Article II - ADMINISTRATION AND ENFORCEMENT / Division 1 - GENERALLY (a) All applications to the building inspector for building permits shall be accompanied by plans in duplicate, drawn to scale, showing: (1) The actual dimensions of the lot to be built upon; (2) The size of the building to be erected; (3) The location of the building on the lot; (4) The location of existing structures on the lot, if any; (5) The number of dwelling units the building is designed to accommodate; (6) The setback lines of buildings on adjoining lots; (7) The layout of off-street parking and loading spaces; and (8) Such other information as may be essential for determining whether the provisions of this chapter are being observed. (b) If the proposed excavation, filling, or construction as set forth in the application are in conformity with the provisions of this chapter and other ordinances of the city then in force, the building department shall issue a building permit upon payment of the required fee. If a building permit is refused, the building inspector shall state such refusal in writing with the cause. ## History (Ord. No. OA-2023-04, 7-10-2023)