Skip to content
Georgia Commons
Menu

Dalton · Zoning Ordinance

Appendix A - ZONING / Article IV - DISTRICT USES AND REGULATIONS

4-5-1. Preliminary site plan. For all parcels

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

which seek rezoning or annexation to R-6, R-7, C-1A, MU, PUD, or U-PUD for a proposed use or which require a special use for a proposed use, a preliminary site plan, as described herein, shall be submitted with such application unless specifically waived, in whole or in part, in the sole discretion of the zoning administrator. Such

application shall remain incomplete without such required information. The governing authority may hereafter conditionally approve such request based upon information set forth in such site plan. Each preliminary site plan shall include, but not be limited to, the following information:

(a) Preliminary name of the proposed development; name(s), address(es), and telephone number of the owner(s) and the designer(s) of the site plan.

(b) Scaled boundaries. Scaled boundaries of the entire tract and their relationship to adjoining properties, public rights-ofway, and easements.

(c) Sewage management systems, on-site (septic systems); sewage treatment system, public or community (central sewage treatment plant). Written statement from the environmental health department indicating the optimum number of units the property will accommodate based on a

soils report by a soils scientist and an on-site inspection by a county environmental specialist. If public sewer is available, written approval shall be provided from Dalton Utilities for the number of desired sewer taps.

(d) Septic system absorption field and replacement area and building locations.

Approximate location of the septic fields, all proposed buildings, their shape, size, and setback in appropriate scale.

(e) Rights-of-way. Location and right-of-way of streets, roads, alleys, railroads, public crosswalks, with lengths and widths, road names, or designations.

(f) Buffers and vegetation. Existing and proposed vegetation and the use of vegetation to provide buffers and landscaping for the proposed development.

(g) Flood plain areas. Location of the 100- year flood plain as determined by the past history of flooding or the best available data.

(h) Proposed improvements. The names, where appropriate, and locations and dimensions of proposed roads, alleys, sidewalks, easements, buildings, parking and loading, dumpsters, recreation areas and facilities, yards and other open spaces.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:dalton/zoning/4-5-1@2026-11-11-3e38eb3fb2

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Dalton Zoning Ordinance, 4-5-1. Preliminary site plan. For all parcels | Georgia Commons