permitted outright in the C-2 and C-4 zoning districts and are permitted on parcels with a minimum lot size of five acres in the GA and SA zoning districts. 4-6-31 For brewpubs, microbreweries, microdistillery/wineries, special conditions shall apply as follows: (1) an off-street or alley loading dock is required; (2) drive through service is not allowed.