Dalton · Zoning Ordinance
Appendix 5A - URBAN PUD DESIGN STANDARDS / Article VII - TOWERS AND ANTENNAE
7-5-1. Construction/inspections. Towers shall
About this text
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
be constructed and maintained in compliance with applicable building codes, industry standards, and standards for
towers published by the Electronic Industries Association, as amended.
(a) Tower owners shall conduct and be solely responsible for periodic writ7-2 DALTON CODE ten inspections of such towers at least every 12 months to ensure structural integrity. Such inspections shall be conducted by a structural engineer with a current
license issued by the State of Georgia. The results of such inspection shall be submitted to the Whitfield County Engineer or his or designee and shall be maintained
by the tower owner(s) and available for public review upon request.
(b) If, upon a review of the results of such inspections or upon physical inspection, the Whitfield County Engineer or his or designee concludes that a tower fails to comply with such codes and standards and poses a danger to persons or property, then upon written notice thereof to the owner, the owner shall have 30 days to bring such tower into compliance. Should the owner fail to bring the tower into compliance within 30
days, Whitfield County may remove such tower at the owner's expense pursuant to O.C.G.A. § 41-2-8 through § 41-2-12.
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.