lot or parcel development requiring a buffer until such time as that buffer, as specified herein, shall be substantially in place or until acceptable surety for the cost of the buffer installation shall be provided to the building inspector. Acceptable surety shall consist either of an irrevocable letter of credit from an approved lending institution or a performance bond from an approved insurer in an amount not less than $15.00 per linear foot of area to be buffered. The required buffer must be completed and in place within 30 days before any such surety shall lapse or within six months of the issuance of the building permit, whichever shall occur sooner.