1) Lots shall have the following widths at the building site in accordance with the use of the lot: Lot Minimum: R-1-HDD, 60 feet. 2) Setbacks. Where existing buildings express a traditionally modest (pre-zoning) front setback, creating a characteristically close relationship with the street, it is highly desirable to continue this pattern in order to retain the area's character. Therefore, the maximum setback of new construction should harmonize with the average setbacks of existing adjacent buildings. All setbacks shall be undisturbed vegetated spaces, except where sidewalks and public easements are required. Lots shall have the following front setback requirements as measured from the right-ofway in accordance with the use of the lot: Lot Minimum: R-1-HDD, 25 feet.* *Any application for rezoning of properties within the HDD shall have their front setbacks determined by the Darien Historic Preservation Commission in accordance with the harmony of adjacent properties, subject to approval from the Darien mayor and council. If, for example, the surrounding buildings have a front setback of ten feet, then a new development shall have a front setback of ten feet, also. 3) Lots shall have the following side-yard setback requirements in accordance with the use of the lot: Lot Minimum: R-1-HDD, ten feet. 4) Lots shall have the following rear-yard setback requirements in accordance with the use of the lot: Lot Minimum: R-1-HDD, ten feet.