1. The following fees are hereby established. Electrical permit $50.00 Re-inspection fee $50.00 Inspection-Temporary air curtain destructors $100.00 Mobile home permit $300.00 Move permit $275.00 Demolition permit $100.00 Building permit—single-family $750.00 Building permit—accessory $150.00 Building permit—additions $250.00 Building permit—church $700.00 Building permit—swimming pool $150.00 Building permit—dock $200.00 Building permit—commercial $1,000.00 Building permit—multifamily per unit 1—5 units $750.00 6—10 units $700.00 11—20 units $650.00 21 units or more $600.00 Building permit—renovation $250.00 Building permit—signs $75.00 Building permit—industrial $1,200.00 Building permit—fence $75.00 2. Any construction not covered by the schedule listed above and over $2,000.00 in cost shall be assessed at the rate of $3.00 per $1,000.00 for the purpose of permitting. 3. For multifamily building permits the schedule is graduated; therefore the fee must be paid at each level as the number of units increase. 4. A $100.00 water usage fee shall accompany each building permit application. This payment shall be made in addition to, and by separate instrument from, the building permit fees as established in paragraph 1. (Ord. No. 2022-01, § l(Exh. A), 1-25-2022; Ord. No. 2022-07, § l(Exh. A), 6-21-2022; Ord. No. 2023-02, § I(Exh. A), 4-18-2023)