Dooly County · Zoning Ordinance
Article XI - INDUSTRIAL (I)
Section 3. Conditional Uses
About this text
- As posted on the county's website, retrieved 2026-11-23
1. Airports and landing fields
2. Asphalt plant
3. Cement, lime, gypsum or plaster of paris manufacturing
4. Chemical plant
5. Commercial incinerator
6. Corrosive acid or alkali storage and manufacturing
7. Explosives manufacturing or storage
8. Fertilizer manufacturing other than blending
9. Fish, poultry, beef and pork processing
10. Hazardous waste facilities
11. Salvage yards, automobile salvage yards or scrap metal processors
12. Lumber yards and sawmills
13. Manufacture of glue or gelatin
14. Manufacture and storage of gas including, but not limited to butane, propane, chlorine, or other toxic, noxious or pyrophoric gases
15. Paper and pulp manufacturing
16. Petroleum bulk plants
17. Processing of silica, clays and other soils
18. Recycling centers
19. Rendering plants
20. Slaughterhouses and stock yards
21. Photovoltaic Solar Energy Production Facility - Provided all of the following conditions are met in addition to any other condition that may be imposed by the Planning and Zoning Commission:
A. Area of use may not exceed on hundred (100) acres on site with no aggregation of solar collection panels on adjacent properties which exceeds one hundred
(100) acres.
B. Solar energy production facilities shall adhere to the setback and height requirements of the district in which they are located and shall be fenced in using a minimum of three (3) strand barbwire fencing with danger, high voltage warning type signs attached to said fencing no less than every one hundred (100) feet.
C. Abutting residential properties shall be visually screened from the project through any one or combination of the following: plantings, existing vegetation or fencing (not to exceed eight (8) feet in height). The screening, capable of providing year-round screening, shall be provided along the non-reflective sides of the solar energy production facility or collection of facilities.
D. The manufacturer's or installers' identification, the facility owners' name and contact information, and the appropriate warning signage shall be posted on or near the panels in a clearly visible manner and on the required fencing.
E. All electrical interconnection and distribution lines within the project boundary, except for power lines that leave the project or are within the substation, shall be underground, unless determined otherwise by the Planning and Zoning
Commission or Code Enforcement because of severe environmental constraints.
F. Lighting of the solar energy production facility and accessory structures shall be limited to the minimum necessary.
G. Professional Engineer drawings that clearly illustrate the design of the solar energy production facility shall be submitted as part of the Conditional Use application package. The Planning and Zoning Board may apply aesthetic consideration when approving the design of the solar energy production facility.
H. Any solar energy production facility that has not been in use for its original purpose for a period of one hundred and eighty (180) days shall be deemed to be abandoned. The solar energy production facility owner and/or the property owner shall have an additional ninety (90) days to remove the abandoned solar energy system and any appurtenant structures or to reactivate the solar energy system.
I. The Planning and Zoning Board may, in its discretion, waive any of the above listed conditions or may add additional conditions if such is deemed to be in the best interest of the citizens and public safety.
In granting any conditional use, the Planning and Zoning Commission and Board of Commissioners may prescribe additional and appropriate conditions and safeguards in conformity with this ordinance in order to mitigate the impact of the use to surrounding uses and to otherwise protect the public health, safety and general welfare. Violation of such conditions and safeguards, when made a part of the terms under which the conditional use is granted, shall be deemed a violation of this ordinance.
Solar Panel
22. Any use Conditioned in the C-1 or C-2 zones
Read this code where it is posted (county website (doolycountyga.com)) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.