--- title: Douglas Zoning Ordinance, Sec. 111-130. Impervious surface coverage collection: local-codes id: local-code:douglas/zoning/111-130 cite_as: Douglas, Ga., Zoning Ordinance § 111-130 canonical_url: https://georgiacommons.org/code/local/douglas/zoning/111-130 md_url: https://georgiacommons.org/code/local/douglas/zoning/111-130.md text_url: https://georgiacommons.org/code/local/douglas/zoning/111-130/text source_url: https://library.municode.com/ga/douglas/codes/code_of_ordinances date: 2026-11-11 status: active jurisdiction: city:douglas jurisdiction_name: Douglas place_fips: "1323872" corpus_version: local-codes-douglas-1a5a00cb6228 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/douglas/zoning/~part-ii/~part-b/~chapter-111/~article-v.md previous: https://georgiacommons.org/code/local/douglas/zoning/111-129.md next: https://georgiacommons.org/code/local/douglas/zoning/111-131.md index: https://georgiacommons.org/code/local/douglas.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:douglas/zoning/111-130@2026-11-11-6a06cfc5ea --- # Douglas Zoning Ordinance, Sec. 111-130. Impervious surface coverage > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Part B - CONSTRUCTION, LAND USE AND LAND DEVELOPMENT / Chapter 111 / Article V - DEVELOPMENT STANDARDS (a) Maximum coverage. Impervious surface coverage on a development site shall not exceed the maximum coverage amounts provided in Table 111-129. (b) Calculation. Impervious surface coverage is determined by calculating the total impervious surface area as a percentage of the gross site area. Water bodies are impervious and shall be included as such in the calculation of impervious surface coverage. (c) Pervious concrete. If pervious concrete is proposed for a project, then 50 percent of the area covered with pervious concrete shall be considered as a pervious surface provided it is installed and maintained in accordance with manufacturer's guidelines. ## History (Code 1993, pt. III, ch. 5, § 5)