Sec. 111-144. Electric vehicle (EV) charging facilities, equipment and structures.
About this text
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(a) Purpose. The purpose of this section is to promote and support the gradual adoption of electric vehicles (EVs) in the City of Douglas by establishing requirements and guidelines for EV charging infrastructure. Recognizing the city's rural character and current limited EV adoption, this section aims to balance the need for long-term infrastructure readiness with the flexibility necessary to ensure development and redevelopment remains feasible and cost-effective. This section seeks to:
(1) Encourage the transition to clean and sustainable transportation.
(2) Ensure safe, accessible, and consistent implementation of EV charging infrastructure.
(3) Provide guidance to developers, property owners, and utility partners on permitted locations, zoning compliance, and design standards.
(4) Expand EV charging accessibility across a variety of zoning districts, including commercial, residential, industrial, agricultural, neighborhood commercial, and gateway zones.
(5) Position the City of Douglas to participate in state and federal funding opportunities related to EV infrastructure and clean energy initiatives.
(6) Position the City of Douglas as a forward-thinking community while respecting its rural character and resources.
(b) Definitions.
DC fast charging means a charging station that supplies direct current (DC) for rapid charging.
Electric vehicle (EV) means any motor vehicle that uses electric power for propulsion, either partially or fully.
EV charging station means a facility that provides electric energy to recharge the battery of EVs.
EV-ready space means a paved parking space that has electrical conduit and sufficient electrical capacity to accommodate the future installation of an EV charging station.
Level 1 charging means a charging station using a standard 120-volt alternating current (AC) outlet, typical for residential settings.
Level 2 charging means a charging station supplying 240-volt AC, providing faster charging than Level 1.
(c) Applicability. EV-Ready infrastructure provisions may substitute for installed charging stations in cases where demand is anticipated to grow but does not yet justify full investment.
This section applies to all new construction, major renovations, and certain existing buildings within the City of Douglas, including:
(1) Public facilities or major renovations of public facilities owned by the City of Douglas.
(2) Private commercial developments or renovations that significantly expand parking facilities (adding more than 20 percent of parking spaces).
(3) Multi-unit residential developments with five or more units.
(4) Parking lots or structures with 20 or more parking spaces.
This section does not apply to individual single-family residences or private EV charging stations.
(d) Permitted zoning districts. Zoning applicability across all districts (residential, commercial, industrial and agricultural) reflects the city's comprehensive planning approach, while exemptions or variances may be considered for low demand uses. Permitted in all zones.
(e) EV charging infrastructure requirements.
(1) Public facilities.
a. New construction. New public buildings (e.g., libraries, city halls, recreational centers) installing at least one Level 2 EV charging station in parking areas with 20 or more spaces.
b. Existing public buildings. For major renovations involving 50 percent or more of the building or parking lot, at least one EV-ready space and one Level 2 EV charging station can be installed.
c. Parks and recreational areas. If a parking lot at a park or recreation area has more than 20 spaces, at least one EV charging station can be installed.
(2) Commercial developments.
a. New construction. New retail, commercial, and industrial developments that create parking facilities with 20 or more spaces, can install at least one Level 2 EV charging station and designate at least ten percent of spaces as EV-ready.
b. Major renovations. When expanding parking facilities by 20 percent or more, at least one EV charging station can be installed if the total number of spaces exceeds 20.
(3) Multi-unit residential developments.
a. New developments. For multi-unit dwellings (MUDs) with five or more units, at least one EV-ready space per ten units can be installed.
1. A minimum of one Level 2 EV charging station can be installed for every ten units in development with ten or more units.
b. Renovations. When parking facilities are renovated in MUDs, one EV-ready space can be installed for every ten units.
(4) Parking lots or structures (public or private).
a. New parking lots or structures. For lots or structures with more than 20 parking spaces, at least five percent of spaces can have EV charging stations, and ten percent of spaces must be EV-ready.
b. Major renovations. In parking lots where substantial renovation occurs, a minimum of five percent of spaces can be equipped with EV charging stations.
(5) Voluntary installation in existing developments. Existing commercial, residential, and public property owners are encouraged, but not required, to install EV charging infrastructure.
(f) Design standards for EV charging stations.
(1) Visibility and signage. EV charging stations must be clearly marked with appropriate signage indicating their use and reserved status for EVs.
(2) Accessibility. EV charging stations must be placed in visible, well-lit, and accessible areas of parking lots to encourage usage and enhance safety.
(3) Maintenance. The property owner or operator is responsible for ensuring that EV charging stations are maintained in working condition.
(4) Waste management. EV charging areas shall include a trash receptacle, recognizing that users often eat or clean their vehicles during charging. The trash receptacle shall be covered for sanitation and animal resistance and be emptied no less than twice per week by the property owner. Paved areas surrounding charging stations shall be periodically swept and kept clean and free of litter and debris by the property owner.
(g) Flexibility in rural context.
(1) EV-ready option. Developers may meet requirements through EV-ready spaces (conduit + electrical capacity) rather than full station installation to reduce upfront costs.
(2) Phased approach. Developers may propose phased EV installation aligned with adoption rates, subject to the community development department approval.
(3) Variance requests. Considered on a case-by-case basis, particularly for agricultural, low-density, or short-term turnover uses.
(h) Enforcement and compliance.
(1) Permitting process. Compliance with this section will be checked during the permit review process for new construction or major renovations.
(2) Penalties for non-compliance. Non-compliance with this section may result in the withholding of occupancy permits or other fines, as determined by the City of Douglas.
History
(Ord. No. 09222025, §§ 1—8, 9-22-2025)