Sec. 6.03. FH flood hazard.

About this text

  • As published by Municode, current through 2024-12-16
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

A. Purpose. The FH flood hazard district is comprised of lands that are subject to periodic flooding. The intent of the regulations within this zoning district is to limit the use of such floodplain lands to prevent flood damage to persons and properties and minimize expenditures for flood relief programs, flood control projects and flood damage repair; preserve drainage courses that will be adequate to carry storm water runoff from existing and future land developments; prohibit landfills or other obstructions to the flow of floodwaters; permit uses that are appropriate on floodplains and utilize effectively this valuable resource.

B. Restrictions on use within the FH flood hazard overlay district.

1. Flood hazard overlay district takes precedence over zoning districts. Notwithstanding the uses permitted for the zoning district applying to the property, no building or structure or land shall hereafter be used or occupied as herein provided and no building or structure or part thereof shall be erected, constructed, reconstructed, removed or altered except in conformity with the requirements of this section when such lands fall within the flood hazard overlay district. Where this overlay district coincides with any other overlay district, the most restrictive requirements shall apply.

2. Uses permitted in flood hazard areas. Within the FH flood hazard overlay district the following uses are permitted if otherwise permitted within the zoning district:

a. Agriculture, including forestry and livestock raising, requiring no structure within the flood hazard area except structures for temporary shelter, and including agriculture and forestry access roads.

b. Dams, provided they are constructed in accordance with specification of the U.S.D.A. Soil Conservation Service, or the U.S. Army Corps of Engineers.

c. Public parks and recreation areas and facilities including, but not limited to, boat ramps, docks, parking areas, and recreation facilities: private and commercial recreation developments, and campgrounds.

d. Fences having sufficient open area to permit the free flow of water and debris.

e. Roads and parking areas constructed in such a manner as to permit the free flow of floodwaters.

f. Public utility poles, towers, pipelines, sewers, streets, and similar facilities, provided they are constructed in such a manner as to permit the free flow of floodwaters.

g. Signs, provided they permit the free flow of water.

h. Other uses may be permitted by special use permit provided they are in accordance with all provisions of this UDO. Such uses include, but are not limited to the following: landing field or heliport; extraction or removal of sand, gravel, earth, clay or other natural resources; greenhouse; plant nursery or truck garden; radio, television or similar towers; accessory parking areas;

temporary sawmill or similar; outdoor recreation or amusement; fairs, expositions, and the like.

C. Floodplain management and flood damage prevention standards.

1. General provisions.

a. Purpose and intent. The purpose of this section is to protect, maintain and enhance the public health, safety, environment and general welfare and to minimize public and private losses due to flood conditions in flood hazard areas, as well as to protect the beneficial uses of floodplain areas for water quality protection, streambank and stream corridor protection, wetlands preservation and ecological and environmental protection by provisions designed to:

1) Require that uses vulnerable to floods, including facilities which serve such uses, be protected against flood damage at the time of initial construction;

2) Restrict or prohibit uses which are dangerous to health, safety and property due to flooding or erosion hazards, or which increase flood heights, velocities, or erosion;

3) Control filling, grading, dredging and other development which may increase flood damage or erosion;

4) Prevent or regulate the construction of flood barriers which will unnaturally divert floodwaters or which may increase flood hazards to other lands;

5) Limit the alteration of natural floodplains, stream channels, and natural protective barriers which are involved in the accommodation of floodwaters;

and,

6) Protect the stormwater management, water quality, streambank protection, stream corridor protection, wetland preservation and ecological functions of natural floodplain areas.

b. Applicability. This section shall be applicable to all areas of special flood hazard within the City of Douglasville.

c. Designation of administrator. The city engineer or their designee is hereby appointed to administer and implement the provisions of this section, 6.03, FH flood hazard. For the purpose of section 6.03, the terms "city engineer" and "development official" are used interchangeably.

d. Basis for area of special flood hazard—Flood area maps and studies. For the purposes of this section, the following are adopted by reference:

1) The flood insurance study (FIS), dated December 30, 2020, with accompanying maps and other supporting data and any revision thereto are hereby adopted by reference. For those land areas acquired by the City of Douglasville through annexation, the current effective FIS and data for Douglas County, dated December 30, 2020, with accompanying maps and other supporting data and any revision thereto are hereby adopted by reference. Notwithstanding the above text, references herein to the FIS shall mean the most recent flood insurance study with accompanying maps adopted by the Federal emergency Management Agency for the City of Douglasville's participation in the National Flood Insurance Program.

2) Other studies which may be relied upon for the establishment of the base flood elevation or delineation of the 100-year floodplain and floodprone areas include:

a) Any flood or flood-related study conducted by the United States Army Corps of Engineers, the United States Geological Survey or any other local, state or federal agency applicable to the City of Douglasville; or

b) Any base flood study authored by a registered professional engineer in the State of Georgia which has been prepared by FEMA approved methodology and approved by the City of Douglasville.

3) Other studies which may be relied upon for the establishment of the future conditions flood elevation or delineation of the future conditions floodplain and floodprone areas include:

a) Any flood or flood-related study conducted by the United States Army Corps of Engineers, the United States Geological Survey, or any other local, state or federal agency applicable to the City of Douglasville; or

b) Any future conditions flood study authored by a registered professional engineer in the State of Georgia which has been prepared by FEMA approved methodology approved by the City of Douglasville.

4) The repository for public inspection of the FIS, accompanying maps and other supporting data is located at the office of the Douglasville Development Official.

e. Compatibility with other regulations. This section is not intended to modify or repeal any other ordinance, rule, regulation, statute, easement, covenant, deed restriction or other provision of law. The requirements of this UDO are in addition to the requirements of any other ordinance, rule, regulation or other provision of law, and where any provision of this section imposes restrictions different from those imposed by any other ordinance, rule, regulation or other provision of law, whichever provision is more restrictive or impose higher protective standards for human health or the environment shall control.

f. Severability. If the provisions of any section, subsection, paragraph, subdivision or clause of this section shall be adjudged invalid by a court of competent jurisdiction, such judgment shall not affect or invalidate the remainder of any section, subsection, paragraph, subdivision or clause of this UDO.

g. Warning and disclaimer of liability. The degree of flood protection required by this section is considered reasonable for regulatory purposes and is based on scientific and engineering considerations. Larger floods can and will occur;

flood heights may be increased by manmade or natural causes. This article does not imply that land outside the areas of special flood hazard or uses permitted within such areas will be free from flooding or flood damages. This section shall not create liability on the part of the City of Douglasville or by any officer or employee thereof for any flood damages that result from reliance on this section or any administrative decision lawfully made thereunder.

2. Permit procedures and requirements.

a. Permit application requirements. No owner or developer shall perform any development activities on a site where an area of special flood hazard is located without first meeting the requirements of this section prior to commencing the proposed activity. Unless specifically excluded by this section, any landowner or developer desiring a permit for a development activity shall submit to the City of Douglasville a permit application on a form provided by the City of Douglasville for that purpose. No permit will be approved for any development activities that do not meet the requirements, restrictions and criteria of this section.

b. Floodplain management plan requirements. An application for a permit authorized by this UDO with any area of special flood hazard located on the site will be required to include a floodplain management/flood damage prevention plan. This plan shall include the following items:

1) Site plan drawn to scale, which includes but is not limited to:

a) Existing and proposed elevations of the area in question and the nature, location and dimensions of existing and/or proposed structures, earthen fill placement, amount and location of excavation material, and storage of materials or equipment;

b) For all proposed structures, spot ground elevations at building corners and 20-foot or smaller intervals along the foundation footprint, or one-foot contour elevations throughout the building site;

c) Proposed locations of water supply, sanitary sewer, and utilities;

d) Proposed locations of drainage and stormwater management facilities;

e) Proposed grading plan;

f) Base flood elevations and future conditions flood elevations;

g) Boundaries of the base flood floodplain and future conditions floodplain;

h) If applicable, the location of the floodway; and

i) Certification of the above by a registered professional engineer or surveyor.

2) Building and foundation design detail, including but not limited to:

a) Elevation in relation to mean sea level (or highest adjacent grade) of the lowest floor, including basement, of all proposed structures;

b) Elevation in relation to mean sea level to which any nonresidential structure will be floodproofed;

c) Certification that any proposed nonresidential floodproofed structure meets the criteria in subsection 6.03.C.4.b.2)., nonresidential buildings;

d) For enclosures below the base flood elevation, location and total net area of foundation openings as required in subsection 6.03.C.4.a.5)., elevated buildings.

e) Design plans certified by a registered professional engineer or architect for all proposed structure(s).

3) Description of the extent to which any watercourse will be altered or relocated as a result of the proposed development;

4) Hard copies and digital files of computer models, if any, copies of work maps, comparison of pre- and post-development conditions base flood elevations, future conditions flood elevations, flood protection elevations, special flood hazard areas and regulatory floodway widths, flood profiles and all other computations and other information similar to that presented in the FIS;

5) Copies of all applicable state and federal permits necessary for proposed development; and

6) All appropriate certifications required under this article.

The approved floodplain management/flood damage prevention plan shall contain certification by the applicant that all development activities will be done according to the plan or previously approved revisions. Any and all development permits and/or use and occupancy certificates or permits may be revoked at any time if the construction and development activities are not in strict accordance with approved plans.

c. Construction stage submittal requirements.

1) For all new construction and substantial improvements on sites with a floodplain management/flood damage prevention plan, the permit holder shall provide to the development official a certified as-built elevation certificate or floodproofing certificate for nonresidential construction including the lowest floor elevation or floodproofing level immediately after the lowest floor or floodproofing is completed.

2) A final elevation certificate shall be provided after completion of construction including final grading of the site.

3) Any lowest floor certification made relative to mean sea level shall be prepared by or under the direct supervision of a registered land surveyor or professional engineer and certified by same.

4) When floodproofing is utilized for nonresidential structures, said certification shall be prepared by or under the direct supervision of a professional engineer or architect and certified by same.

Any work undertaken prior to approval of these certifications shall be at the permit holder's risk. The development official shall review the above referenced certification data submitted. Deficiencies detected by such review shall be corrected by the permit holder immediately and prior to further work being allowed to proceed. Failure to submit certification or failure to make the corrections required hereby shall because to issue a stop-work order for the project.

d. Duties and responsibilities of the development official. Duties of the development official shall include, but shall not be limited to:

1) Review all development applications and permits to assure that the requirements of this section have been satisfied and to determine whether proposed building sites will be reasonably safe from flooding;

2) Require that copies of all necessary permits from governmental agencies from which approval is required by federal or state law, including but not limited to Section 404 of the Federal Water Pollution Control Act Amendments of 1972, 33 U.S.C. 1334, be provided and maintained on file;

3) When base flood elevation data or floodway data have not been provided, then the development official shall require the applicant to obtain, review and reasonably utilize any base flood elevation and floodway data available from a federal, state or other sources in order to meet the provisions of sections 6.03.C.3. and 6.03.C.4.;

4) Review and record the actual elevation in relation to mean sea level (or highest adjacent grade) of the lowest floor, including basement, of all new or substantially improved structures;

5) Review and record the actual elevation, in relation to mean sea level to which any new and substantially improved structures have been floodproofed;

6) When floodproofing is utilized for a nonresidential structure, the development official shall obtain certification of design criteria from a registered professional engineer or architect;

7) Notify affected adjacent communities and the Georgia Department of Natural Resources prior to any alteration or relocation of a watercourse and submit evidence of such notification to the Federal Emergency Management Agency (FEMA);

8) Where interpretation is needed as to the exact location of boundaries of the areas of special flood hazard (e.g., where there appears to be a conflict between a mapped boundary and actual field conditions) the development official shall make the necessary interpretation. Any person contesting the location of the boundary shall be given a reasonable opportunity to appeal the interpretation as provided in this section. Where floodplain elevations have been defined, the floodplain shall be determined based on flood elevations rather than the area graphically delineated on the floodplain maps; and,

9) All records pertaining to the provisions of this section shall be maintained in the office of the development official and shall be open for public inspection.

3. Standards for development.

a. Definition of floodplain boundaries.

1) Studied "A" zones, as identified in the FIS, shall be used to establish base flood elevations whenever available.

2) For all streams with a drainage area of 100 acres or greater, the future conditions flood elevations shall be provided by the City of Douglasville. If future conditions elevation data is not available from the City of Douglasville, then it shall be determined by a registered professional engineer using a method approved by FEMA and the City of Douglasville.

b. Definition of floodway boundaries. The width of a floodway shall be determined from the FIS or FEMA approved flood study. For all streams with a drainage area of 100 acres or greater, the regulatory floodway shall be provided by the City of Douglasville. If floodway data is not available from the City of Douglasville, then it shall be determined by a registered professional engineer using a method approved by FEMA and the City of Douglasville.

c. General standards.

1) No development shall be allowed within the future conditions floodplain that could result in any of the following:

a) Raising the base flood elevation or future conditions flood elevation;

b) Reducing the base flood or future conditions flood storage capacity;

c) Changing the flow characteristics as to the depth and velocity of the waters of the base flood or future conditions flood as they pass both the upstream and the downstream boundaries of the development area; or

d) Creating hazardous or erosion producing velocities or resulting in excessive sedimentation.

2) Any development within the future conditions floodplain allowed under (a) above shall also meet the following conditions:

a) Compensation for storage capacity shall occur between the average groundwater table elevation and the base flood elevation for the base flood, and between the average groundwater table elevation and the future condition flood elevation for the future conditions flood and lie either within the boundaries of ownership of the property being developed and shall be within the immediate vicinity of the location of the encroachment. Acceptable means of providing required compensation include lowering of natural ground elevations within the floodplain or lowering of adjoining land areas to create additional floodplain storage. In no case shall any required compensation be provided via bottom storage or by excavating below the elevation of the top of the natural (predevelopment) stream channel unless such excavation results from the widening or relocation of the stream channel;

b) Cut areas shall be stabilized and graded to a slope of no less than two percent;

c) Effective transitions shall be provided such that flow velocities occurring on both upstream and downstream properties are not increased or decreased;

d) Verification of no-rise conditions, flood storage volumes, and flow characteristics shall be provided via a step-backwater analysis meeting the requirements of subsection 6.03.C.3.d., engineering study requirements for floodplain encroachments.

e) Public utilities and facilities, such as water, sanitary sewer, gas, and electrical systems, shall be located and constructed to minimize or eliminate infiltration or contamination from floodwaters; and

f) Any significant physical changes to the base flood floodplain shall be submitted as a conditional letter of map revision (CLOMR) or conditional letter of map amendment (CLOMA), whichever is applicable.

The CLOMR submittal shall be subject to approval by the City of Douglasville using the community consent forms before forwarding the submittal package to FEMA for final approval. The responsibility for forwarding the CLOMR to FEMA and for obtaining the CLOMR approval shall be the responsibility of the applicant. Within six months of the completion of construction, the applicant shall submit as-built surveys for a final letter of map revision (LOMR).

d. Engineering study requirements for floodplain encroachments. An engineering study is required, as appropriate to the proposed development activities on the site, whenever a development proposes to disturb any land within the future conditions floodplain, except for a residential single-lot development on streams without established base flood elevations and/or floodways for which the provisions of section 6.03.C.3.d., engineering study requirements for floodplain encroachments, apply. This study shall be prepared by a currently registered professional engineer in the State of Georgia and made a part of the application for a permit. This information shall be submitted to and approved by the City of Douglasville prior to the approval of any permit which would authorize the disturbance of land located within the future conditions floodplain. Such study shall include:

1) Description of the extent to which any watercourse or floodplain will be altered or relocated as a result of the proposed development;

2) Step-backwater analysis, using a FEMA approved methodology approved by the City of Douglasville. Cross-sections (which may be supplemented by the applicant) and flow information will be obtained whenever available.

Computations will be shown duplicating FIS results and will then be rerun with the proposed modifications to determine the new base flood profiles, and future conditions flood profiles;

3) Floodplain storage calculations based on cross-sections (at least one every 100 feet) showing existing and proposed floodplain conditions to show that base flood floodplain and future conditions floodplain storage capacity would not be diminished by the development;

4) The study shall include a preliminary plat, grading plan, or site plan, as appropriate, which shall clearly define all future conditions floodplain encroachments.

e. Floodway encroachments. Located within areas of special flood hazard are areas designated as floodway. A floodway may be an extremely hazardous area due to velocity floodwaters, debris or erosion potential. In addition, floodways must remain free of encroachment in order to allow for the discharge of the base flood without increased flood heights. Therefore, the following provisions shall apply:

1) Encroachments are prohibited, including earthen fill, new construction, substantial improvements or other development within the regulatory floodway, except for activities specifically allowed in subsection 2 below.

2) Encroachments for bridges, culverts, roadways and utilities within the regulatory floodway may be permitted provided it is demonstrated through hydrologic and hydraulic analyses performed in accordance with standard engineering practice that the encroachment shall not result in any increase to the pre-project base flood elevations, floodway elevations, or floodway widths during the base flood discharge. A registered professional engineer must provide supporting technical data and certification thereof;

and,

3) If the applicant proposes to revise the floodway boundaries, no permit authorizing the encroachment into or an alteration of the floodway shall be issued by the City of Douglasville until an affirmative conditional letter of map revision (CLOMR) is issued by FEMA and no-rise certification is approved by the City of Douglasville.

f. Maintenance requirements. The property owner shall be responsible for continuing maintenance as may be needed within an altered or relocated portion of a floodplain on his property so that the flood-carrying or flood storage capacity is not diminished. The City of Douglasville may direct the property owner (at no cost to the City of Douglasville) to restore the flood carrying or flood storage capacity of the floodplain if the owner has not performed maintenance as required by the approved floodplain management plan on file with the City of Douglasville.

4. Provisions for flood damage reduction.

a. General standards. In all areas of special flood hazard the following provisions apply:

1) New construction of principal buildings (residential or nonresidential), including manufactured homes, shall not be allowed within the limits of the future conditions floodplain, unless all requirements of subsections 6.03.C.3.c., general standards, 6.03.C.3.d., engineering study requirements for floodplain encroachments, and 6.03.C.3.e., floodway encroachments, have been met;

2) New construction or substantial improvements of existing structures shall be anchored to prevent flotation, collapse or lateral movement of the structure;

3) New construction or substantial improvements of existing structures shall be constructed with materials and utility equipment resistant to flood damage;

4) New construction or substantial improvements of existing structures shall be constructed by methods and practices that minimize flood damage;

5) Elevated buildings. All new construction and substantial improvements of existing structures that include any fully enclosed area located below the lowest floor formed by foundation and other exterior walls shall be designed so as to be an unfinished and flood resistant enclosure. The enclosure shall be designed to equalize hydrostatic flood forces on exterior walls by allowing for the automatic entry and exit of floodwater.

a) Designs for complying with this requirement must either be certified by a professional engineer or architect or meet the following minimum criteria:

i. Provide a minimum of two openings having a total net area of not less than one square inch for every square foot of enclosed area subject to flooding;

ii. The bottom of all openings shall be no higher than one foot above grade; and,

iii. Openings may be equipped with screens, louvers, valves or other coverings or devices provided they permit the automatic flow of floodwater in both directions.

b) So as not to violate the "lowest floor" criteria of this section, the unfinished and flood resistant enclosure shall solely be used for parking of vehicles, limited storage of maintenance equipment used in connection with the premises, or entry to the elevated area; and,

c) The interior portion of such enclosed area shall not be partitioned or finished into separate rooms.

6) All heating and air conditioning equipment and components (including ductwork), all electrical, ventilation, plumbing, and other service facilities shall be designed and/or located three feet above the base flood elevation or one foot above the future conditions flood elevation, whichever is higher, so as to prevent water from entering or accumulating within the components during conditions of flooding;

7) Manufactured homes shall be anchored to prevent flotation, collapse, or lateral movement. Methods of anchoring may include, but are not limited to, use of over-the-top or frame ties to ground anchors. This standard shall be in addition to and consistent with applicable state requirements for resisting wind forces;

8) New and replacement water supply systems shall be designed to minimize or eliminate infiltration of floodwaters into the system;

9) New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of floodwaters into the systems and discharges from the systems into floodwaters;

10) On-site waste disposal systems shall be located and constructed to avoid impairment to them, or contamination from them, during flooding; and,

11) Any alteration, repair, reconstruction or improvement to a structure which is not compliant with the provisions of this article, shall be undertaken only if the nonconformity is not furthered, extended or replaced.

12) If the proposed development is located in multiple flood zones or multiple base flood elevation cross the proposed site, the higher or more restrictive base flood elevation or future condition elevation and development standards shall take precedence.

b. Building standards for structures and buildings within the future conditions floodplain. The following provisions, in addition to those in subsection 6.03.C.4.

shall apply:

1) Residential buildings.

a) New construction. New construction of principal buildings, including manufactured homes shall not be allowed within the limits of the future conditions floodplain unless all requirements of subsections 6.03.C.3.c., general standards, 6.03.C.3.d., engineering study requirements for floodplain encroachments, and 6.03.C.3.e., floodway encroachments, have been met. If all of the requirements have been met, all new construction shall have the lowest floor, including basement, elevated no lower than three feet above the base flood elevation or one foot above the future conditions flood elevation, whichever is higher. Should solid foundation perimeter walls be used to elevate the structure, openings sufficient to equalize the hydrologic flood forces on exterior walls and to facilitate the unimpeded movements of floodwaters shall be provided in accordance with standards of subsection 6.03.C.4.a.5)., elevated buildings.

b) Substantial improvements. Substantial improvement of any principal structure or manufactured home shall have the lowest floor, including basement, elevated no lower than three feet above the base flood elevation or one foot above the future conditions flood elevation, whichever is higher. Should solid foundation perimeter walls be used to elevate a structure, openings sufficient to equalize the hydrologic flood forces on exterior walls and to facilitate the unimpeded movements of floodwaters shall be provided in accordance with standards of subsection 6.03.C.4.a.5)., elevated buildings.

2) Nonresidential buildings.

a) New construction. New construction of principal buildings, including manufactured homes shall not be allowed within the limits of the future- conditions floodplain unless all 6.03.C.3.c., general standards, 6.03.C.3.d., engineering study requirements for floodplain encroachments, and 6.03.C.3.e., floodway encroachments, have been met. New construction that has met all of the requirements may be floodproofed in lieu of elevation. The structure, together with attendant utility and sanitary facilities, must be designed to be watertight to one foot above the base flood elevation, or at least as high as the future conditions flood elevation, whichever is higher, with walls substantially impermeable to the passage of water and structural components having the capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy. A registered professional engineer or architect shall certify that the design and methods of construction are in accordance with accepted standards of practice for meeting the provisions above, and shall provide such certification to the development official.

b) Substantial improvements. Substantial improvement of any principal nonresidential structure located in A1-30, AE, or AH flood hazard zones, may be authorized by the development official to be floodproofed in lieu of elevation. The structure, together with attendant utility and sanitary facilities, must be designed to be water tight to one foot above the base flood elevation, or at least as high as the future conditions flood elevation, whichever is higher, with walls substantially impermeable to the passage of water, and structural components having the capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy. A registered professional engineer or architect shall certify that the design and methods of construction are in accordance with accepted standards of practice for meeting the provisions above and shall provide such certification to the development official.

3) Accessory structures and facilities. Accessory structures and facilities (i.e., barns, sheds, gazebos, detached garages, parking lots, recreational facilities and other similar uninhabitable structures and facilities) which are permitted to be located within the limits of the floodplain shall be constructed of flood resistant materials and designed to pass all floodwater in accordance with subsection 6.03.C.4.a.5)., elevated buildings. and be anchored to prevent flotation, collapse or lateral movement of the structure.

4) Standards for recreational vehicles. All recreational vehicles placed on sites must either:

a) Be on the site for fewer than 180 consecutive days and be fully licensed and ready for highway use, (a recreational vehicle is ready for highway use if it is licensed, on its wheels or jacking system, attached to the site only by quick disconnect type utilities and security devices, and has no permanently attached structures or additions); or

b) The recreational vehicle must meet all the requirements for residential buildings—substantial improvements (subsection 6.03.C.4.b.1).b).), including the anchoring and elevation requirements.

5) Standards for manufactured homes.

a) New manufactured homes shall not be allowed to be placed within the limits of the future conditions floodplain unless all requirements 6.03.C.3.c., general standards, 6.03.C.3.d., engineering study requirements for floodplain encroachments, and 6.03.C.3.e., floodway encroachments, have been met.

b) Manufactured homes placed and/or substantially improved in an existing manufactured home park or subdivision shall be elevated so that either:

i. The lowest floor of the manufactured home is elevated no lower than three feet above the level of the base flood elevation, or one foot above the future conditions flood elevation, whichever is higher; or

ii. The manufactured home chassis is elevated and supported by reinforced piers (or other foundation elements of at least an equivalent strength) of no less than 36 inches in height above grade.

c) All manufactured homes must be securely anchored to an adequately anchored foundation system to resist flotation, collapse and lateral movement in accordance with standards of subsection 6.03.C.4.a.7).

c. Building standards for structures and buildings authorized adjacent to the future conditions floodplain.

1) Residential buildings. For new construction or substantial improvement of any principal residential building or manufactured home, the elevation of the lowest floor, including basement and access to the building, shall be at least three feet above the base flood elevation or one foot above the future conditions flood elevation, whichever is higher.

2) Nonresidential buildings. For new construction or substantial improvement of any principal nonresidential building, the elevation of the lowest floor, including basement and access to the building, shall be at least one foot above the level of the base flood elevation or at least as high as the future conditions flood elevation, whichever is higher.

d. Building standards for residential single—Lot developments on streams without established base flood elevations and/or floodway (A-zones). For a residential single-lot development not part of a subdivision that has areas of special flood hazard, where streams exist but no base flood data have been provided (A-zones), the development official shall review and reasonably utilize any available scientific or historic flood elevation data, base flood elevation and floodway data, or future conditions flood elevation data available from a federal, state, local or other source, in order to administer the provisions and standards of this section. If data are not available from any of these sources, the following provisions shall apply:

1) No encroachments, including structures or fill material, shall be located within an area equal to twice the width of the stream or 50 feet from the top of the bank of the stream, whichever is greater.

2) In special flood hazard areas without base flood or future conditions flood elevation data, new construction and substantial improvements of existing structures shall have the lowest floor of the lowest enclosed area (including basement) elevated no less than three feet above the highest adjacent grade at the building site. Openings sufficient to facilitate the unimpeded movements of floodwaters shall be provided in accordance with subsection 6.03.C.4.a.5)., elevated buildings.

e. Building standards for areas of shallow flooding (AO-zones). Areas of special flood hazard may include designated "AO" shallow flooding areas. These areas have base flood depths of one to three feet above ground, with no clearly defined channel. In these areas the following provisions apply:

1) All substantial improvements of residential and nonresidential structures shall have the lowest floor, including basement, elevated to no lower than one foot above the flood depth number in feet specified on the flood insurance rate map (FIRM), above the highest adjacent grade. If no flood depth number is specified, the lowest floor, including basement, shall be elevated at least three feet above the highest adjacent grade. Openings sufficient to facilitate the unimpeded movements of floodwaters shall be provided in accordance with standards of subsection 6.03.c.2.a.1)

2) Substantial improvement of a nonresidential structure may be floodproofed in lieu of elevation. The structure, together with attendant utility and sanitary facilities, must be designed to be water tight to the specified FIRM flood level plus one foot above the highest adjacent grade, with walls substantially impermeable to the passage of water, and structural components having the capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy. A registered professional engineer or architect shall certify that the design and methods of construction are in accordance with accepted standards of practice; and

3) Drainage paths shall be provided to guide floodwater around and away from any proposed structure.

f. Standards for subdivisions.

1) All subdivision proposals shall identify the special flood hazard area and provide base flood elevation data and future conditions flood elevation data;

2) All residential lots in a subdivision proposal shall have sufficient buildable area outside of the future conditions floodplain such that encroachments into the future conditions floodplain for residential structures will not be required;

3) All subdivision plans will provide the elevations of proposed structures in accordance with subsection 6.03.C.2.b, floodplain management plan requirements.

4) All subdivision proposals shall be consistent with the need to minimize flood damage;

5) All subdivision proposals shall have public utilities and facilities such as water, sanitary sewer, gas, and electrical systems located and constructed to minimize or eliminate infiltration of floodwaters, and discharges from the systems into floodwaters; and

6) All subdivision proposals shall include adequate drainage and stormwater management facilities per the requirements of the City of Douglasville to reduce potential exposure to flood hazards.

5. Variance. Any person to whom a variance is granted shall be given written notice specifying the difference between the base flood elevation and the elevation of the proposed lowest floor and stating that the cost of flood insurance resulting from the lowest floor elevation being placed below the base elevation will be commensurate with the increased risk to life and property, and that such costs may be as high as $25.00 for each $100.00 of insurance coverage provided.

For flood management purposes the following definitions apply:

Basement: any area of the building having its floor subgrade (below ground level) on all sides.

Building: see structure Expansion to an existing manufactured home park or subdivision: the preparation of additional sites by the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads).

Existing manufactured home park or subdivision: a manufactured home park or subdivision for which the construction of facilities for servicing the lots on which manufactured homes are to be affixed (including, at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed before June 25, 1982.

Existing construction: for the purpose of determining rates, structures for which the "start of construction" commenced before June 25, 1982. "Existing construction" may also be referred to as "existing structures."

Manufactured home park or subdivision: a parcel (or contiguous parcels) of land divided into two or more manufactured home lots for rent or sale.

New construction: any structure for which the "start of construction" commenced on or after June 25, 1982 and includes any subsequent improvements to the structure.

Recreational vehicle: a vehicle which is:

(a) Built on a single chassis;

(b) Four hundred square feet or less when measured at the largest horizontal projection;

(c) Designed to be self-propelled or permanently towable by a light duty truck; and

(d) Designed primarily not for use as a permanent dwelling but as temporary living quarters for recreational, camping, travel, or seasonal use.

Structure: for floodplain management purposes, a walled and roofed building, including a gas or liquid storage tank, that is principally above ground, as well as a manufactured home. Structure, for insurance purposes, means:

(a) A building with two or more outside rigid walls and a fully secured roof, that is affixed to a permanent site;

(b) A manufactured home ("a manufactured home," also known as a mobile home, is a structure built on a permanent chassis, transported to its site in one or more sections, and affixed to a permanent foundation); or

(c) A travel trailer without wheels, built on a chassis and affixed to a permanent foundation, that is regulated under the City's floodplain management and building ordinances or laws.F

For the latter purpose, "structure" does not mean a recreational vehicle or a park trailer or similar vehicle, except as described in (c) of this definition, or a gas or liquid storage tank.

Substantial damage: damage of any origin sustained by a structure whereby the cost of restoring the structure to its before damaged condition would equal or exceed 50 percent of the market value of the structure before the damage occurred. This term includes repetitive loss.

Substantial Improvement: Any reconstruction, rehabilitation, addition, or other improvement to a structure, taking place during a 10-year period, in which the cumulative costs equals or exceeds 50 percent of the market value of the structure prior to the improvement. The market value of a building means

(1) the appraised value of the structure prior to the of the initial repair or improvement, or (2) in the case of damage, the value of the structure prior to the damage occurring. The term includes structures which have incurred "substantial damage", regardless of the actual repair work performed. The term does not, however, include those improvements of a structure required to comply with existing state or local health, sanitary, or safety code specifications which are the minimum necessary to assure safe living conditions, which have been identified by the building official. The term does also not include any alteration of a historic structure, provided that the alteration will not preclude the structure's continued designation as a historic structure.

History

The history line the source prints at the end of the section.

(Ord. No. O-2020-70, § 1, 11-16-20; Ord. No. O-2022-8, §§ 8, 9, 3-7-22)

Meetings that refer to this section

Found 1: meetings of this government whose minutes or machine transcripts name this section, or an ordinance in its history line, newest first. Found by rule from those records' own words. A reference is a pointer to another record, not a statement that the section applies or was changed.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:douglasville/code/6.03@2024-12-16-afbb44e4ca

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Douglasville Code of Ordinances, Sec. 6.03. FH flood hazard | Georgia Commons