--- title: Dunwoody Zoning Ordinance, Sec. 16-107. Permit procedure collection: local-codes id: local-code:dunwoody/zoning/16-107 cite_as: Dunwoody, Ga., Zoning Ordinance § 16-107 canonical_url: https://georgiacommons.org/code/local/dunwoody/zoning/16-107 md_url: https://georgiacommons.org/code/local/dunwoody/zoning/16-107.md text_url: https://georgiacommons.org/code/local/dunwoody/zoning/16-107/text source_url: https://library.municode.com/ga/dunwoody date: 2020-02-10 status: active jurisdiction: city:dunwoody jurisdiction_name: Dunwoody place_fips: "1324768" corpus_version: local-codes-dunwoody-12eb400a5ad6 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/dunwoody/zoning/~part-ii/~chapter-16/~article-ii/~division-6.md previous: https://georgiacommons.org/code/local/dunwoody/zoning/16-106.md next: https://georgiacommons.org/code/local/dunwoody/zoning/16-108.md index: https://georgiacommons.org/code/local/dunwoody.md branch: zoning edition: As published by Municode, current through 2020-02-10 edition_date_kind: current_through source_publisher: Municode version_id: local-code:dunwoody/zoning/16-107@2020-02-10-45343c4f36 --- # Dunwoody Zoning Ordinance, Sec. 16-107. Permit procedure > As published by Municode, current through 2020-02-10 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 16 - LAND DEVELOPMENT REGULATIONS / Article II - ENVIRONMENT AND NATURAL RESOURCES / Division 6 - TREE PRESERVATION (a) Submittal of tree protection plan. All applications for a development permit or a substantial building permit must be accompanied by a tree protection plan prepared and sealed by a registered landscape architect, certified arborist, or registered forester. The tree protection plan must include the following information: (1) Tree survey. The tree survey must be a to-scale map or site plan that has been prepared and sealed by a registered landscape architect, certified arborist, regisLAND DEVELOPMENT REGULATIONS § 16-107 tered forester, registered surveyor, or registered engineer. The tree survey must include the following minimum requirements: a. All specimen trees are to be located and labeled with their size and species. Their critical root zone must be delineated and the spot elevation at the base of their trunk must be indicated. They must also be labeled in a way to determine if they are intended for removal or preservation. b. All trees with a DBH measurement of ten inches or larger over-story and six inches or greater for understory must be located and their size and species must be indicated. c. Sampling methods may be used to determine tree density calculations for forested areas over five acres. (2) Definition of spatial limits. a. Limits of land-disturbance, clearing, grading, and trenching. b. Tree protection zones. c. Areas of revegetation. d. Indication of staging areas for parking, material storage, concrete washout, debris burn, and other areas where tree protection may be affected. e. Locations of existing and proposed structures, paving, driveways, cut and fill areas, detention areas, utilities, etc. (3) Detail drawings of tree protection measures (where applicable). a. Protective tree fencing; b. Erosion control fencing; c. Tree protection signs; d. Transplanting specifications; e. Tree wells and aeration systems; f. Staking specifications; and g. Other applicable drawings. (4) Tree density calculations. See appendix A. (5) Installation and maintenance measures Procedures and schedules for the implementation, installation, and maintenance of tree protection measures. (b) Site inspection. An on-site inspection will be made by the city arborist prior to the commencement of any development activity. (c) Review. All landscape plans, tree protection plans, and related documentation must be reviewed by the city arborist for conformance to the provisions of these regulations and either approved, returned for revisions, or denied within 30 days of receipt. If denied, the reasons for denial must be annotated on the landscape plan or otherwise stated in writing. (d) Permit issuance. Issuance of the development permit or a substantial building permit is contingent upon approval of the required tree protection plan and landscape plan and an onsite inspection by the city arborist for tree protection measures. (Ord. No. 2013-10-14, 1(Exh. A § 16-8.20), 10- 14-2013; Ord. No. 2015-01-04, § 1, 1-26-2015; Ord. No. 2018-07-13, § I, 7-23-2018)