The following minimum tree protection measures must be in place for all tree save areas: (1) Tree protection fencing. Trees identified for preservation must have protection fencing that is a minimum of four feet high installed at the edge of the critical root zones. The city arborist is authorized to require the installation of fourfoot fencing in those areas where the likelihood of possible encroachment occurs. All tree protection zones must be designated as such with signage posted visibly on all sides of the fenced area. Signs requesting workers' cooperation and compliance with tree protection standards are recommended at the site entrance(s). (2) Silt fences.All tree protection zones must be designed to prevent the sedimentation of erosion material. Silt fences must be placed along the outer uphill edges of tree protection zones at the development interface. (3) Encroachment. No person may encroach into the tree protection zones. Construction activities, including but not limited to, parking, vehicle and foot traffic, material storage, concrete washout, debris burning, and other activities must be arranged so as to prevent disturbance within the protected areas. (4) Utilities. Reasonable efforts must be made to locate utility lines along corridors between tree protection zones. If utility lines must encroach into the protection zones, they must be installed by tunneling rather than trenching. (5) Maintenance of tree protection. All tree protection devices must remain in fully functioning condition until the certificate of occupancy is issued. a. Any tree, designated for preservation, which is negligently damaged during construction or removed without the appropriate review and approval, as determined by the city arborist, must be treated in accordance with the National Arborists Association Standards. If fatally damaged, the tree(s) must be replaced with four-inch caliper trees equal to the unit value of the tree removed. Any specimen tree damaged as described above must be replaced with trees equal to three times the unit value of the tree removed. b. All tree protection zones must be mulched with at least four inches and not more than eight inches of organic mulch, such as pine straw, wood chips, tree leaves, or compost. c. Construction activity is prohibited inside the tree save areas, including but not limited to, grading, paving, and construction of buildings and other structures. d. The site must be designed and maintained in a manner to ensure proper drainage in tree save areas during and after construction. (6) Tree protection supervisors. The developer must designate a tree protection supervisor. This person must demonstrate knowledge in the area of tree protection practices during construction and must be on-site to ensure tree protection measures are enforced. The tree protection supervisor must participate in a preconstruction conference with the city prior to the commencement of any development. The tree protection supervisor must notify the city arborist immediately should any tree damage occur on the site. (7) Inspections. Tree protection inspections must be performed by a certified arborist or registered forester during construction. The inspections must be conducted prior to the commencement of development, immediately following the clearing and grubbing phase, immediately following the grading phase, and at the end of the project before a certificate of occupancy (commercial developments) is issued or the final plat approved (residenLAND DEVELOPMENT REGULATIONS § 16-111 tial developments). The site must be inspected to ensure all tree protection regulations are being met and to identify any existing or developing tree-related problems that require treatment. An inspection report must be prepared and certified by the inspector and submitted to the city arborist. Any damage noted must be treated in accordance with the recommendation of the inspector prior to the issuance of a certificate of occupancy or approval of the final plat. The city arborist is authorized to require additional reports should he/she determine significant construction damage has occurred, the tree protection supervisor has failed to enforce minimum protection standards, or if other development processes, including but not limited to utility placement and building construction, may impact the tree save areas. (Ord. No. 2013-10-14, 1(Exh. A § 16-8.60), 10- 14-2013; Ord. No. 2015-01-04, § 1, 1-26-2015; Ord. No. 2017-10-19, § I, 10-9-2017)