(a) General. These street tree planting requirements apply in all districts.

(b) Tree planting requirements.

(1) A street tree planting plan must be submitted to and approved by the city arborist prior to issuance of a development permit. The plan must be prepared and

sealed by a registered landscape architect, certified arborist or registered forester. All proposed trees must be individually identified on the plan with an included tree species list.

(2) Street trees must be planted in the rightof-way. Trees must be planted at intervals or no more than 50 feet and no closer than 25 feet to street intersections. Street trees are not required abutting each individual lot where spacing distances are inadequate. Street trees

are required on both sides of the street.

The city arborist may approve alternate spacing when the 50-foot spacing requirement cannot be met due to driveways and other improvements.

(3) Street tree species shall be selected in accordance with appendix B and the approved general street list and street trees as defined in section 16-116, subject to approval by the city arborist. No more than 35 percent of any one species may be used throughout the development.

(4) Street trees must have a minimum caliper of three inches. They must be singlestemmed with a single, straight leader.

(5) The builder/developer must install the street trees specified on the street tree planting plan prior to the issuance of the certificate of occupancy. However, street tree plantings may be delayed from May 1 through October 1, provided that the builder enters into a performance surety agreement with the city guaranteeing tree planting by October 15. The performance surety agreement must be executed before the issuance of certificates of occupancy.

(6) Street trees count towards the minimum individual lot tree density requirements set forth in article II, division 6.

(c) Installation and maintenance.

(1) Installation.

a. All trees must be installed in a sound workmanlike manner and according to accepted good planting procedures. No certificate of occupancy or similar authorization may be issued unless the requirements

of this section have been met.

b. Impermeable rigid tree root barriers must be installed in a linear method in all tree planting areas.

The barriers must be a minimum of 24 inches deep and include ribs to direct root growth downward. The root barriers must be installed in accordance with city standards and specifications.

c. Expandable plastic tree trunk protectors must be installed on each tree.

(2) Staking and guying. Newly planted trees may not be staked or guyed unless approved by the city arborist.

(3) Maintenance. Street trees must be maintained by the property owner who owns the abutting lot or by the property owners' association. Maintenance must include watering, pruning, tree replacement and removal of leaves and litter from the sidewalks and street, as necessary. A maintenance responsibility statement must be provided on the final plat.

History

The history line the source prints at the end of the section.

(Ord. No. 2013-10-14, 1(Exh. A § 16-14.30), 10-14-2013; Ord. No. 2015-01-04, § 1, 1-26- 2015; Ord. No. 2018-07-13, § II, 7-23-2018)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:dunwoody/zoning/16-238@2020-02-10-80ee93ddec

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.