(a) Applicability. The provisions of this section apply to easements for or in subdivisions. (b) Dedication permission. The applicant must obtain permission from the community development director for the dedication of utility easements prior to the submission of the dedication. (c) On-site floodplain easements. Where a subdivision is traversed by a stream, or floodplain, a floodplain easement must be dedicated to the city. The easement must conform to the requirements of this chapter and must conform substantially to the limits of such stream or floodplain plus additional width outside the floodplain limits, up to five feet, as necessary to accommodate future access. (d) Off-site drainage easements. Where drainage system improvements are required on private land outside the subdivision, appropriate drainage rights must be secured by the applicant and indicated on the plat. (e) Nonmotorized transportation easements and paths. Nonmotorized transportation easements and paths are required in subdivisions or projects requiring a land development permit to provide circulation or access to schools, parks, libraries, shopping centers, transportation centers and other community facilities. Such ease-ments must have a width of 15 feet. Such paths must be surfaced and constructed in accordance with city standards and specifications.