--- title: Dunwoody Zoning Ordinance, Sec. 16-56. Purpose collection: local-codes id: local-code:dunwoody/zoning/16-56 cite_as: Dunwoody, Ga., Zoning Ordinance § 16-56 canonical_url: https://georgiacommons.org/code/local/dunwoody/zoning/16-56 md_url: https://georgiacommons.org/code/local/dunwoody/zoning/16-56.md text_url: https://georgiacommons.org/code/local/dunwoody/zoning/16-56/text source_url: https://library.municode.com/ga/dunwoody date: 2020-02-10 status: active jurisdiction: city:dunwoody jurisdiction_name: Dunwoody place_fips: "1324768" corpus_version: local-codes-dunwoody-12eb400a5ad6 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/dunwoody/zoning/~part-ii/~chapter-16/~article-ii/~division-3.md previous: https://georgiacommons.org/code/local/dunwoody/zoning/16-48-to-16-55.md next: https://georgiacommons.org/code/local/dunwoody/zoning/16-57.md index: https://georgiacommons.org/code/local/dunwoody.md branch: zoning edition: As published by Municode, current through 2020-02-10 edition_date_kind: current_through source_publisher: Municode version_id: local-code:dunwoody/zoning/16-56@2020-02-10-5b5d8d02ac --- # Dunwoody Zoning Ordinance, Sec. 16-56. Purpose > As published by Municode, current through 2020-02-10 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 16 - LAND DEVELOPMENT REGULATIONS / Article II - ENVIRONMENT AND NATURAL RESOURCES / Division 3 - SOIL EROSION, SEDIMENTATION AND POLLUTION CONTROL The soil erosion, sedimentation and pollution control regulations of this division are primarily intended to: (1) Minimize the removal of vegetation; (2) Minimize the exposure of bare earth to precipitation by encouraging the scheduling of land development in increments of workable size which can be completed within a single construction season or within a time period compatible with the type and size of the project; (3) Provide for the reestablishment of vegetation within a reasonable period following completion of final grading and utility installation; (4) Give priority to the installation of streets, parking lots and other areas within a reasonable time following completion of final grading; and (5) Encourage the use of erosion control and sedimentation techniques found in the Manual for Erosion and Sedimentation Control in Georgia, as published by the state soil and water conservation commission. ## History (Ord. No. 2013-10-14, 1(Exh. A § 16-5.10), 10- 14-2013; Ord. No. 2015-01-04, § 1, 1-26-2015)