(a) Erosion, sedimentation and pollution control measures and practices. Excessive soil erosion and resulting sedimentation can take place during land-disturbing activities. Therefore, plans for those land-disturbing activities that are not expressly exempted by this division must contain provisions for soil erosion, sedimentation and pollution control measures and practices. These provisions must be incorporated into the erosion, sedimentation and pollution control plans. Erosion, sedimentation and pollution control measures and practices must be applied to all features of the site, including street and utility installations, stormwater management facilities, drainage facilities and other temporary and permanent improvements. Measures must be installed to prevent or control erosion, sedimentation and pollution during all stages of any landdisturbing activity. The community development director may require that land-disturbing activities be phased. Soil erosion, sedimentation and pollution control plans must address appropriate measures to effectively control soil erosion during successive phases of construction. (b) Best management practices. (1) The best management practices set forth of this section (subsection (b)) and the minimum protections established in subsection (c) are required for all landdisturbing activities. Proper design by phases, installation and maintenance of best management practices constitutes a complete defense to any action by the director of the environmental protection division or to any other allegation of noncompliance with subsection (b)(2) or any substantially similar terms contained in a permit for the discharge of stormwater issued pursuant to O.C.G.A. § 12-5- 30(f), the Georgia Water Quality Control Act. As used in this section, the terms "proper design" and "properly designed" mean designed in accordance with the hydraulic design specifications contained in the Manual for Erosion and Sediment Control in Georgia specified in O.C.G.A. § 12-7-6(b). (2) A discharge of stormwater runoff from disturbed areas where best management practices have not been properly designed, installed, and maintained constitutes a separate violation of any landdisturbing permit issued by a Local issuing authority or of any state general permit issued by the environmental protection division of the Georgia Department of Natural Resources pursuant to O.C.G.A. § 12-5-30(f), the Georgia Water Quality Control Act, for each day on which such discharge results in the turbidity of receiving waters being increased by more than 25 nephelometric turbidity units for waters supporting warm water fisheries or by more than ten nephelometric turbidity units for waters classified as trout waters. The turbidity of the receiving waters must be measured in accordance with guidelines to be issued by the director of the environmental protection division. This section does not apply to any land-disturbance associated with the construction of single-family homes that are not part of a larger common plan of development or sale unless the planned disturbance for such construction is equal to or greater than five acres. (3) Failure to properly design, install, or maintain best management practices constitutes a violation of any land-disturbing permit issued by a Local issuing authority or of any state general permit issued by the environmental protection division pursuant to O.C.G.A. § 12-5-30(f), the Georgia Water Quality Control Act, for each day on which such failure occurs. (4) The director of the environmental protection division may require, in accordance with regulations adopted by the Georgia Board of Natural Resources, reasonable and prudent monitoring of the turbidity level of receiving waters into which discharges from land-disturbing activities occur. (c) Protections. The rules and regulations, ordinances, or resolutions adopted pursuant to this chapter for the purpose of governing landdisturbing activities require, at a minimum, protections at least as stringent as the state general permit; and best management practices, including conservation and engineering practices to prevent and minimize erosion and resultant sedimentation, which are consistent with, and no less stringent than, those practices contained in the Manual for Erosion and Sediment Control in Georgia published by the state soil and water conservation commission as of January 1 of the year in which the land-disturbing activity was permitted, as well as the following: (1) Stripping of vegetation, grading and other development activities must be conducted in a manner so as to minimize erosion. (2) Cut-fill operations must be kept to a minimum. (3) Development plans must conform to topography and soil type so as to create the lowest practical erosion potential. (4) Whenever feasible, natural vegetation must be retained, protected and supplemented as provided in article II, division 6. (5) The disturbed area and the duration of exposure to erosive elements must be kept to a practicable minimum. (6) Disturbed soil must be stabilized as quickly as practicable. (7) Temporary vegetation or mulching must be employed to protect exposed critical areas during development. (8) Permanent vegetation and structural erosion control practices must be installed as soon as practicable. (9) To the extent necessary, sediment in runoff must be trapped by the use of debris basins, sediment basins, silt traps, or similar measures until the disturbed area is stabilized. As used in this section, a disturbed area is stabilized when it is brought to a condition of continuous compliance with the requirements of O.C.G.A. § 12-7-1 et seq. (10) Adequate provisions must be provided to minimize damage from surface water to the cut face of excavations or the sloping of fills. (11) Cuts and fills may not endanger adjoining property. (12) Fills may not encroach upon natural watercourses or constructed channels in a manner so as to adversely affect other property owners. (13) Grading equipment must cross flowing streams by means of bridges or culverts except when such methods are not feasible, provided, in any case, that such crossings are kept to a minimum. (14) Land-disturbing activity plans for erosion, sedimentation and pollution control must include provisions for treatment or control of any source of sediments and adequate sedimentation control facilities to retain sediment onsite or preclude sedimentation of adjacent waters beyond the levels specified in subsection (b)(2). (15) Except as provided in subsection (c)(16), there is established a 25-foot state buffer along the banks of all state waters, as measured horizontally from the point where vegetation has been wrested by normal stream flow or wave action, except where the director of the environmental protection division approves a variance that is at least as protective of natural resources and the environment, where otherwise allowed by the director of the environmental protection division pursuant to O.C.G.A. § 12-2-8, or where a drainage structure or a roadway drainage structure must be constructed, provided that adequate erosion control measures are incorporated in the project plans and specifications, and are implemented; or along any ephemeral stream. As used in this section, the term "ephemeral stream" means a stream that, under norLAND DEVELOPMENT REGULATIONS § 16-59 mal circumstances, has water flowing only during and for a short duration after precipitation events; that has the channel located above the groundwater table year-round; for which ground water is not a source of water; and for which runoff from precipitation is the primary source of water flow. Unless exempted as along an ephemeral stream, the buffers of at least 25 feet established pursuant to O.C.G.A. § 12-5-440 et seq., of the Georgia Water Quality Control Act, must remain in force unless a variance is granted by the director of the environmental protection division, as provided in this section. The following requirements apply to any such buffer: a. No land-disturbing activities may be conducted within a buffer and a buffer must remain in its natural undisturbed state of vegetation until all land-disturbing activities on the construction site are completed. Once the final stabilization of the site is achieved, a buffer may be thinned or trimmed of vegetation as long as a protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; provided, however, that any person constructing a single-family residence, when such residence is constructed by or under contract with the owner for his own occupancy, may thin or trim vegetation in a buffer at any time as long as protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; and b. The buffer does not apply to the following land-disturbing activities, provided that they occur at an angle, as measured from the point of crossing, within 25 degrees of perpendicular to the stream; cause a width of disturbance of not more than 50 feet within the buffer; and adequate erosion control measures are incorporated into the project plans and specifications and are implemented at: 1. Stream crossings for water lines; or 2. Stream crossings for sewer lines; (16) There is established a 50-foot buffer as measured horizontally from the point where vegetation has been wrested by normal stream flow or wave action, along the banks of any state waters classified as "trout streams" pursuant to O.C.G.A. § 12-5-20 et seq., the Georgia Water Quality ControlAct, except where a roadway drainage structure must be constructed; provided, however, that small springs and streams classified as trout streams which discharge an average annual flow of 25 gallons per minute or less must have a 25-foot buffer or they may be piped, at the discretion of the landowner, pursuant to the terms of a rule providing for a general variance promulgated by the Georgia Board of Natural Resources, so long as any such pipe stops short of the downstream landown- er's property and the landowner complies with the buffer requirement for any adjacent trout streams. The director of the environmental protection division may grant a variance from such buffer to allow land-disturbing activity, provided that adequate erosion control measures are incorporated in the project plans and specifications and are implemented. The following requirements apply to such buffer: a. No land-disturbing activities may be conducted within a buffer and a buffer must remain in its natural, undisturbed, state of vegetation until all land-disturbing activities on the construction site are completed. Once the final stabilization of the site is achieved, a buffer may be thinned or trimmed of vegetation as long as a protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; provided, however, that any person constructing a single-family residence, when such residence is constructed by or under contract with the owner for his own occupancy, may thin or trim vegetation in a buffer at any time as long as protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; and b. The buffer does not apply to stream crossings for water lines or stream crossings for sewer lines, provided that they occur at an angle, as measured from the point of crossing, within 25 degrees of perpendicular to the stream; cause a width of disturbance of not more than 50 feet within the buffer; and adequate erosion control measures are incorporated into the project plans and specifications and are implemented at stream crossings for the sewer or water lines. (d) Injury to other property. The fact that landdisturbing activity for which a permit has been issued results in injury to the property of another does not constitute proof of nor create a presumption of a violation of the standards provided for in this section or the terms of the permit. (Ord. No. 2013-10-14, 1(Exh. A § 16-5.40), 10- 14-2013; Ord. No. 2015-01-04, § 1, 1-26-2015; Ord. No. 2017-03-06, § 1, 3-27-2017)