--- title: Dunwoody Zoning Ordinance, Sec. 16-60. Land-disturbance permits collection: local-codes id: local-code:dunwoody/zoning/16-60 cite_as: Dunwoody, Ga., Zoning Ordinance § 16-60 canonical_url: https://georgiacommons.org/code/local/dunwoody/zoning/16-60 md_url: https://georgiacommons.org/code/local/dunwoody/zoning/16-60.md text_url: https://georgiacommons.org/code/local/dunwoody/zoning/16-60/text source_url: https://library.municode.com/ga/dunwoody date: 2020-02-10 status: active jurisdiction: city:dunwoody jurisdiction_name: Dunwoody place_fips: "1324768" corpus_version: local-codes-dunwoody-12eb400a5ad6 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/dunwoody/zoning/~part-ii/~chapter-16/~article-ii/~division-3.md previous: https://georgiacommons.org/code/local/dunwoody/zoning/16-59.md next: https://georgiacommons.org/code/local/dunwoody/zoning/16-61.md index: https://georgiacommons.org/code/local/dunwoody.md branch: zoning edition: As published by Municode, current through 2020-02-10 edition_date_kind: current_through source_publisher: Municode version_id: local-code:dunwoody/zoning/16-60@2020-02-10-f2a2edc0cb --- # Dunwoody Zoning Ordinance, Sec. 16-60. Land-disturbance permits > As published by Municode, current through 2020-02-10 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 16 - LAND DEVELOPMENT REGULATIONS / Article II - ENVIRONMENT AND NATURAL RESOURCES / Division 3 - SOIL EROSION, SEDIMENTATION AND POLLUTION CONTROL (a) Required. No person may conduct any land-disturbing activity within the city without first obtaining a land-disturbance permit from the community development director to perform such activity and providing a copy of the notice of intent to the environmental protection division, if applicable. (b) Review of plans and ordinances.The property owner, developer and designated planners and engineers must review the general development plans and detailed plans of the Local issuing authority that affect the tract to be developed and the area surrounding it. They must review the zoning ordinance, stormwater management ordinance, subdivision ordinance, flood damage prevention ordinance, this chapter, and other ordinances which regulate the development of land within the jurisdictional boundaries of the Local issuing authority. However, the owner is the only party who may obtain a permit. (c) Applications. (1) The application for a permit must be submitted to the community development director and must include the applicant's erosion, sedimentation and pollution control plan with supporting data, as necessary. The plans must include, at a minimum, the data specified in subsection (d). Soil erosion, sedimentation and pollution control plans must conform to the provisions of section 16-59. Applications for a permit will not be accepted unless accompanied by eight copies of the applicant's soil erosion, sedimentation and pollution control plans. All applications must contain a certification stating that the plan preparer or the designee thereof visited the site prior to creation of the plan or that such a visit was not required in accordance with rules and regulations established by the Georgia Board of Natural Resources. (2) A permitting fee, as determined by the city council must be charged for each acre or fraction thereof in the project area. (3) In addition to the local permitting fees, fees will also be assessed pursuant to O.C.G.A. § 12-5-23(a)(5), provided that such fees may not exceed $80.00 per acre of land-disturbing activity, and these fees must be calculated and paid by the primary permittee as defined in the state general permit for each acre of landdisturbing activity included in the planned development or each phase of development. All applicable fees must be paid prior to issuance of the land-disturbance permit. In a jurisdiction that is certified pursuant to O.C.G.A. § 12-7-8(a) half of such fees levied must be submitted to the EPD; except that any and all fees due from an entity which is required to give notice pursuant to O.C.G.A. § 12-7- 17(9) or (10) must be submitted in full to the EPD, regardless of the existence of a Local issuing authority in the jurisdiction. (4) Immediately upon receipt of an application and plan for a permit, the Local issuing authority must refer the application and plan to the soil and water conservation district for its review and approval concerning the adequacy of the erosion, sedimentation and pollution control plan. The soil and water conservation district must approve or disapprove a plan within 35 days of receipt. Failure of the soil and water conservation district to act within 35 days will be construed as an approval of the pending plan. The results of the soil and water conservation district review must be forwarded to the Local issuing authority. No permit may be issued unless the plan has been approved by the soil and water conservation district, all required fees have been paid and any variances required by section 16-59 and any financial guarantees required in accordance with subsection (c)(6) have been obtained. Such a review will not be required if the Local issuing authority and the soil and water conservation district have entered into an agreement which allows the Local issuing authority to conduct such review and approval of the plan without referring the application and plan to the soil and water conservation district. The Local issuing authority must approve or disapprove a revised plan submittal within 35 days of receipt of a complete application. Failure of the Local issuing authority to take action within this required 35-day period means that the revised plan has been deemed approved by the issuing authority. (5) If a permit applicant has had two or more violations of previous permits, this chapter, or the Erosion and Sedimentation Act, as amended, within three years prior to the date of filing of the application under consideration, the community development director may deny the permit application. (6) The community development director may require the permit applicant to post a bond in the form of government security, cash, irrevocable letter of credit, or any combination thereof up to, but not exceeding, $3,000.00 per acre or fraction thereof of the proposed land-disturbing activity, prior to issuing the permit. If the applicant does not comply with this section or with the conditions of the permit after issuance, the community development director may call the bond or any part thereof to be forfeited and may use the proceeds to hire a contractor to stabilize the site of the land-disturbing activity and bring it into compliance. (d) Plans. (1) Applications and plans must be prepared to meet the minimum requirements of subsections (c) and (d). Conformance with the minimum requirements may be attained through the use of design criteria in the current issue of the Manual for Erosion and Sediment Control in Georgia, published by the state soil and water conservation commission as a guide; or through the use of more stringent alternate design criteria which conform to conservation and engineering practices including, but not limited to, design criteria published by the city or the city's approved stormwater management policy. The Manual for Erosion and Sediment Control in Georgia is incorporated by reference into this chapter as if fully set forth herein. The plan for the land-disturbing activity must consider the interrelationship of the soil types, geological and hydrological characteristics, topography, watershed, vegetation, proposed permanent structures including roadways, constructed waterways, sediment control and stormwater management facilities, local ordinances and state laws. (2) Site plans must be submitted, which include all of the information required by the applicable, current erosion, sedimentation and pollution control plan review checklist established by the soil and water conservation commission. The site plan must also include the following minimum data: a. Narrative or notes, and other information; notes or narrative are to be located on the site plan in general notes or in erosion and sediment control notes; b. A description of existing land use at project site and description of proposed project; c. Name, address, and phone number of the property owner; d. Name and phone number of 24- hour local contact who is responsible for erosion, sedimentation and pollution controls; e. Size of project, or phase under construction, in acres; f. Activity schedule showing anticipated starting and completion dates for the project. The following statement must be on the site plan in bold letters: "The installation of erosion, sedimentation and pollution control measures and practices must occur prior to or concurrent with land-disturbing activities"; g. Stormwater and sedimentation management systems-storage capacity, hydrologic study, and calculations, including off-site drainage areas; h. Vegetative plan for all temporary and permanent vegetative measures, including species, planting dates, and seeding, fertilizer, lime, and mulching rates. The vegetative plan should show options for yearround seeding; i. Detailed drawings for all structural practices. Specifications may follow guidelines set forth in the Manual for Erosion and Sediment Control in Georgia, but must be site specific; j. Maintenance statement: "Erosion, sedimentation and pollution control measures will be maintained at all times. If full implementation of the approved plan does not provide for effective erosion and sediment control, additional erosion and sediment control measures must be implemented to control or treat the sediment source."; and k. Other information pertinent to requirements of this chapter as required by the community development director. l. Requirements for construction site operators to control waste such as discarded building materials, concrete truck washout, chemicals, litter, or sanitary waste at the construction site that may cause adverse water quality impacts. (3) Maps, drawing, and supportive computations must bear the signature/seal of a registered or certified professional in engineering, architecture, landscape architecture, land surveying, or erosion, sedimentation and pollution control. After December 31, 2006, all persons involved in land development design, review, permitting, construction, monitoring, or inspection or any land-disturbing activity must meet the education and training certification requirements as developed by the soil and water conservation commission pursuant to O.C.G.A. § 12-7-20. The certified plans must contain: a. Graphic scale and north point or arrow indicating magnetic north; b. Vicinity maps showing location of project and existing streets; c. Boundary line survey; d. Delineation of disturbed areas within project boundary; e. Existing and planned contours, with an interval in accordance with the following: Map Scale Ground Slope (%) Contour Interval (feet) 1 inch = 100 ft. or larger scale Flat 0—2 0.5 or 1 Rolling 2—8 1 or 2 Step 8 + 2, 5, or 10 f. Adjacent areas and feature areas such as streams, lakes, residential areas, etc., which might be affected should be indicated on the plan; g. The names of property owners and current zoning of all abutting property; h. Proposed structures or additions to existing structures and paved areas; i. The delineated stream buffers as required by article II, division 4, adjacent to state waters identified by the city; j. The location of erosion, sedimentation and pollution control measures and practices using coding symbols from the Manual for Erosion and Sediment Control in Georgia, "Chapter (6)" (4) Maintenance of all soil erosion, sedimentation and pollution control practices, whether temporary or permanent, are at all times the responsibility of the property owner. (e) Permits. (1) Permits must be issued or denied as soon as practicable but in any event not later than 45 days after receipt by the community development director and soil and water conservation district of a completed application, provided variances and bonding are obtained, where necessary. (2) No permit may be issued by the community development director unless the erosion, sedimentation and pollution control plan has been approved and the community development director has affirmatively determined that the plan is in compliance with this chapter, any variances required by section 16-59 are obtained, any financial guarantees required in accordance with subsection (c)(6) are provided and all ordinances and rules and regulations in effect within the jurisdictional boundaries of the city are met. If the permit is denied, the reason for denial must be furnished to the applicant. (3) Any land-disturbing activities by a Local issuing authority are subject to the requirements of this division and to any other regulations relating to land development, as are applied to private persons and the soil and water conservation district will enforce such requirements upon the Local issuing authority. (4) If the tract is to be developed in phases, then a separate permit is required for each phase. (5) The permit may be suspended, revoked, or modified by the city, as to all or any portion of the land affected by the plan, upon finding that the holder or his successor in the title is not in compliance with the approved erosion, sedimentation and pollution control plan or that the holder or his successor in title is in violation of this chapter. A holder of a permit must notify any successor in title of all conditions contained in the permit. (6) No permit may be issued until the applicant files documents with the community development director demonstrating compliance with all applicable local, state and federal requirements. (Ord. No. 2013-10-14, 1(Exh. A § 16-5.50), 10- 14-2013; Ord. No. 2015-01-04, § 1, 1-26-2015; Ord. No. 2017-03-06, §§ 1, 2, 3-27-2017)