Sec. 16-91. Post construction stormwater management for new development and redevelopment.

About this text

  • As published by Municode, current through 2020-02-10
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Purpose. The regulations of this division are adopted to protect, maintain and enhance the public health, safety, environment and general welfare by establishing minimum requirements and procedures to control the adverse effects of increased post-construction stormwater

runoff and nonpoint source pollution associated with new development and redevelopment.

Proper management of post-construction stormwater runoff will minimize damage to public and private property and infrastructure, safeguard the public health, safety, environment and general welfare of the public, and protect water

and aquatic resources. Additionally, the City of Dunwoody is required to comply with several state and federal laws, regulations and permits and the requirements of the Metropolitan North Georgia Water Planning District's regional water plan related to managing the water quantity, velocity, and quality of post-construction

stormwater run-off.

(b) Adoption and implementation of the

GSMM.

(1) Georgia Stormwater Management Manual. The City of Dunwoody must use and require compliance with all relevant criteria, specifications, calculations, formulas, methods, design standards and other guidance provided in the Georgia

Stormwater Management Manual and its appendices, as may be hereafter amended. The rainfall intensities used in hydrologic and hydraulic computations must be those published in the Georgia Stormwater Management Manual

(GSMM).

(2) This division is not intended to modify or repeal any other article, ordinance, rule, regulation or other provision of law, including but not limited to any applicable stream buffers under state and local laws,

and the Georgia Safe Dams Act and Rules for Dam Safety. In the event of any conflict or inconsistency between any provision in the City of Dunwoody's MS4 permit and this division, the provision from the MS4 permit shall control. In the event of any conflict or inconsistency between any provision of this division and the GSMM, the provision in this division shall control. In the event of any other conflict or inconsistency between this division and any other regulation, the provision that is more restrictive or imposes higher protective standards for human health or the environment shall control.

(3) If any provision of this division is invalidated by a court of competent jurisdiction, such judgment shall not affect or invalidate the remainder of this division.

(4) Designation of administrator. The city manager may from time to time appoint someone to administer and implement this division.

(c) Applicability criteria for stormwater management standards. The stormwater management regulations of this division applies to the following activities:

(1) New development that involves the creation, addition or replacement of 5,000 square feet or more of new impervious

surface area or that involves other land disturbing activities of one acre or more;

(2) Redevelopment (excluding routine maintenance and exterior remodeling) that creates, adds, or replaces 5,000 square

feet or more of new impervious surface area or that involves land disturbing activity of one acre or more;

(3) New development and redevelopment if:

a. Such new development or redevelopment is part of a subdivision or other common plan of development, and

b. The sum of all associated impervious surface area or land disturbing activities meets or exceeds applicability criteria of paragraphs (1) and

(2) above;

(4) Any commercial or industrial new development or redevelopment, regardless of size, that is a hotspot land use as defined in this division; and

(5) Linear transportation projects that exceed the threshold in paragraphs (1) or

(2) above.

(d) Exemptions from stormwater management standards. The following activities are exempt from the stormwater management requirements of this division:

(1) Land disturbing activity conducted by local, state, authority, or federal agencies solely to respond to an emergency need to protect life, limb, or property or

conduct emergency repairs;

(2) Land disturbing activity that consists solely of cutting a trench for utility work and related pavement replacement;

(3) Land disturbing activity conducted by local, state, authority or federal agencies whose sole purpose is to implement stormwater management or environmental restoration;

(4) Agricultural practices as described in O.C.G.A. § 12-7-17(5) within areas zoned for these activities with the exception of buildings or permanent structures that exceed the threshold in sections 16- 91(c)(1) or 16-91(c)(2);

(5) Silvicultural land management activities as described in O.C.G.A. § 12-7-17(6) within areas zoned for these activities with the exception of buildings or permanent structures that exceed the threshold in sections 16-91(c)(1) or 16-91(c)(2);

(6) Repairs to any stormwater management facility or practice deemed necessary by the community development director, or designee;

(7) Installations or modifications to existing structures solely to implement Americans with Disabilities Act (ADA) requirements, including, but not limited to, elevator shafts, handicapped access ramps and parking, and enlarged entrances or

exits; and

(8) Linear transportation projects being constructed by the City of Dunwoody to the extent the administrator determines that

the stormwater management standards may be infeasible to apply, all or in part, for any portion of the linear transportation project. For this exemptions to apply, an infeasibility report that is compliant with the City of Dunwoody linear feasibility program shall first be submitted to the administrator that contains adequate documentation to support the

evaluation for the applicable portion(s) and any resulting infeasibility determination, if any, by the administrator.

(e) Stormwater management standards.Subject to the applicability criteria in section 16- 91(c) and exemptions in section 16-91(d), the

following standards apply:

(1) Design of stormwater management system: The design of the stormwater management system shall be in accordance with the applicable sections of the GSMM

as directed by the community development director, or designee. Any design which proposes a dam shall comply with

the Georgia Safe Dams Act and rules for dam safety as applicable;

(2) Natural resources inventory: Site reconnaissance and surveying techniques shall be used to complete a thorough assessment of existing natural resources, both terrestrial and aquatic found on the site.

Resources to be identified, mapped, and shown on the stormwater management plan, shall include, at a minimum (as applicanble):

a. Topography (min. of 2-foot contours) and steep slopes (slopes >15 percent).

b. Natural drainage divides and patterns.

c. Natural drainage features (e.g., swales, basins, depressed areas).

d. Natural feature protection and conservation areas (such as wetlands, lakes, ponds, floodplains, stream

buffers, drinking water wellhead protection areas and river corridors).

e. Predominant soils (including erodible soils and karst areas), and

f. Existing, predominant vegetation, including trees, high quality habitat and other existing vegetation;

(3) Better site design practices for stormwater mangaement. Stormwater management plans shall preserve the natural drainage and treatment systems and reduce the generation of additional stormwater funoff and pollutants to the maximum extent practicable;

(4) Stormwater runoff quality/reduction:

a. For development with a stormwater management plan submitted before December 6, 2020, the applicant may choose either (A) Runoff reduction or (B) Water quality.

b. For development with a stormwater management plan submitted on or after December 6, 2020, the applicant shall chose (A) Runoff reduction and additional water quality shall not be required. To the extent (A)

Runoff reduction has been determined to be infeasible for all or a portion of the site using the practicability policy, then (B) Water quality shall apply for the remaining runoff from a 1.2 inch rainfall event and must be treated to remove at least

80 percent of the calculated average annual post-development total suspended solids (TSS) load or

equivalent as defined in the GSMM.

(A) Runoff reduction - The stormwater management system shall be designated to retain the first 1.0 inch of rainfall on the site using runoff reduction methods to the maximum

extent practicable.

(B) Water quality - the stormwater management system shall be designed to removed at least 80 percent of the calculated average annual post-development TSS load from a 1.2 inch rainfall event, or equivalent as defined in the GSMM.

c. If a site is determined to be a hotspot, the City of Dunwoody may require the use of specific or additional components for the stormwater management system to

address pollutants of concern generated by that site;

(5) Stream channel protection: Stream channel protection shall be provided by using all of the following three approaches:

a. Preservation, restoration and/or reforestation (with native vegetation) of the applicable stream buffer;

b. 24-hour extended detention storage of the one-year, 24-hour return frequency storm event; and

c. Erosion prevention measures such as energy dissipation and velocity control.

(6) Overbank flooding protection. Downstream overbank flood and property protection must be provided by controlling (attenuating) the post-development peak

discharge rate to the predevelopment rate for the 25-year, 24-hour return frequency storm event. If control of the one-year, 24-hour storm is exempted,

then peak discharge rate attenuation of the two-year through the 25-year return frequency storm event must be provided;

(7) Extreme flooding protection. Extreme flood and public safety protection must be provided by controlling and safely conveying the 100-year, 24-hour return frequency storm event such that flooding is not exacerbated;

(8) Downstream analysis. Due to peak flow timing and runoff volume effects, some structural components of the stormwater management system fail to reduce discharge peaks to pre-development levels downstream of the site. A downstream

peak flow analysis must be provided to the point in the watershed downstream of the site or the stormwater management downstream from the project to a point in the drainage basin where the

project area is ten percent of the total basin area (GSMM, section 3.1.9). This is to help ensure that there are minimal downstream impacts from development on the site. The downstream analysis may result in the need to resize structural components of the stormwater management system. In calculating runoff volumes and discharge rates, consideration may need to be given to any planned future upstream land use changes.

(9) Stormwater system inspection and maintenance. The components of the stormwater management system that will

not be dedicated to and accepted by the City of Dunwoody, including all drainage facilities, best management practices, credited conservation spaces, and conveyance systems, shall have an inspection and maintenance agreement to ensure that they continue to function as designed. All new development and redevelopment sites are to prepare a comprehensive inspection and maintenance agreement for the on-site stormwater

management system. This plan shall be written in accordance with the requirements in section 16-92.

(f) Information required with land development permit pplications. Except as otherwise expressly exempted, land development permit

applications must be accompanied by the following information:

(1) Stormwater management plan in accordance with section 16-92;

(2) Performance bond, if applicable; and

(3) Applicable permit application and plan review fees.

History

The history line the source prints at the end of the section.

(Ord. No. 2020-11-21, § I, 11-30-2020)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:dunwoody/zoning/16-91@2020-02-10-281d39d49b

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.