--- title: Dunwoody Zoning Ordinance, Sec. 27-150.1. Telecommunication facilities and structures on private property collection: local-codes id: local-code:dunwoody/zoning/27-150.1 cite_as: Dunwoody, Ga., Zoning Ordinance § 27-150.1 canonical_url: https://georgiacommons.org/code/local/dunwoody/zoning/27-150.1 md_url: https://georgiacommons.org/code/local/dunwoody/zoning/27-150.1.md text_url: https://georgiacommons.org/code/local/dunwoody/zoning/27-150.1/text source_url: https://library.municode.com/ga/dunwoody date: 2020-02-10 status: active jurisdiction: city:dunwoody jurisdiction_name: Dunwoody place_fips: "1324768" corpus_version: local-codes-dunwoody-12eb400a5ad6 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/dunwoody/zoning/~part-ii/~chapter-27/~article-iii/~division-2.md previous: https://georgiacommons.org/code/local/dunwoody/zoning/27-150.md next: https://georgiacommons.org/code/local/dunwoody/zoning/27-150.2.md index: https://georgiacommons.org/code/local/dunwoody.md branch: zoning edition: As published by Municode, current through 2020-02-10 edition_date_kind: current_through source_publisher: Municode version_id: local-code:dunwoody/zoning/27-150.1@2020-02-10-6dda27bc5d --- # Dunwoody Zoning Ordinance, Sec. 27-150.1. Telecommunication facilities and structures on private property > As published by Municode, current through 2020-02-10 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 27 - ZONING TABLE OF CONTENTS / Article III - USES AND USE-SPECIFIC REGULATIONS / Division 2 - SUPPLEMENTAL USE REGULATIONS (a) Application submittals.Applications for administrative permit or special use permit in accordance with this section shall include the following: (1) Name, address, and telephone number of a principal officer and local agent of the applicant; (2) Physical address of the parcel upon which the proposed antenna, telecommunication support structure or alternative telecommunication support structure is to be erected; (3) Name of the person, firm, corporation, or association erecting the antenna, telecommunication support structure or alternative telecommunication support structure, including all parties with a prospective ownership interest in the proposed antenna, telecommunication support structure or alternative telecommunication support structure; (4) Written consent of all parties with an existing ownership interest, including all underlying land owners and owners or licensees of any affected, existing telecommunication support structures or alternative telecommunication support structures, allowing the application; (5) A site plan showing existing vegetation to be removed from the site and vegetation to be replanted to replace the vegetation that will be removed; (6) A certified statement prepared by an engineer licensed in Georgia or other qualified industry professional indicating that the erection and operation of the proposed antenna, telecommunication support structure or alternative telecommunication support structure, including reception and transmission functions, will not interfere with public safety communications or the usual and customary transmission or reception of radio, television, or other telecommunication service enjoyed by adjacent properties; (7) Proof of and/or certified copies of any required approval, registration, and/or licensure from the commission for any provider of telecommunications services to provide such services in the State of Georgia, where applicable, and any other required FAA, FCC, or otherwise state and federal approval, registration, and/or licensure required to erect the proposed antenna, new telecommunication support structure or alternative telecommunication support structure; (8) Written certification that all emissions from any antenna on the telecommunication support structure will comply with FCC frequency emissions standards; (9) For new telecommunication support structure applications, the applicant shall provide photo-simulated, post-construction renderings of the completed proposed telecommunication support structure equipment compound and/or equipment cabinets, ancillary structures, and landscaping, if any. The views shall incorporate before and after scenarios, a scaled, color image of the proposed type of facility, an aerial map with the location of the selected views, and a description of the technical approach used to create the photo simulations. The simulations shall include a minimum of four vantage points (generally north, south, east, and west). Based on the information provided the applicant may be required to provide other pictorial representations from other viewpoints including, but not limited to, state highways and other major roads; state and local parks; other public lands; historic districts; preserves and historic sites normally open to the public; and from any other location where the site is visible to a large number of visitors, travelers or residents; (10) The community development director may, at his sole discretion, require a balloon test to be conducted at any time during which an application is pending before the city; (11) Six sets of accurate scale drawings including a scaled site plan and a scaled elevation view and other supporting drawings, calculations, and other documentation including, but not limited to, the method of construction and attachment to the ground for the telecommunication support structure. The plans for the telecommunication support structure construction shall be certified by a registered structural engineer licensed in the State of Georgia as meeting all current safety and design standards of all applicable federal, state, and city codes, and shall show the location and dimensions of all improvements, including information concerning topography, radio frequency coverage, telecommunication support structure height requirements, setbacks, drives, parking, fencing, landscaping, adjacent uses, and other information deemed by the community development director to be necessary to assess compliance with this article. In addition, the report from the structural engineer must contain: a. Telecommunication support structure height and design, including technical, engineering, economic, and other pertinent factors governing selection of the proposed design.A cross-section of the telecommunication support structure shall be included; b. Total anticipated capacity of the structure, including number and types of antenna(s) which can be accommodated; c. Evidence of structural integrity of the proposed telecommunication support structure; and d. Failure characteristics of the telecommunication support structure and demonstration that site and setbacks are of adequate size to contain debris. (b) Approval criteria. In reviewing and acting on administrative and special land use permit applications, authorized review and decisionmaking bodies must consider the following factors in addition to the generally applicable approval criteria of section 27-359 and 27-441, as applicable: (1) Height of the proposed facility; (2) Proximity of the facility to residential structures; (3) Nature of uses on adjacent and nearby properties; (4) Surrounding topography; (5) Surrounding tree cover and foliage; (6) Design of the facility, with particular reference to design characteristics that have the effect of reducing or eliminating visual obtrusiveness; and (7) Compliance with of this section and section 27-150. (c) Review process. (1) All co-location antennas and any new small cell installation support structures require a special administrative permit from the community development director. Any new non-small cell telecommunication support structure requires a special use permit from the mayor and city council. Fees for administrative permits for small cell installations may not exceed $500.00 for the first five locations, and $100.00 for each additional location, requested simultaneously. (2) For non-small cell technology installations, the community development director shall have 30 days in which to review the application for completeness in accordance with the requirements of this section, the Federal Telecommunications Act and any applicable state law. If the application is found to be incomplete, the community development director shall state so in writing to the applicant, detailing the specific Code section, statute or provision of federal law under which that determination was made. Upon the issuance of the written notice, the required federal and/or state decision clock shall be tolled until such time as an updated application is filed. If the application remains incomplete after the resubmission, said incompleteness may serve as valid reason for denial of the application by either the community development director or city council, as applicable. (3) For small cell technology installations the community development director shall notify an applicant submitting an application of any identified deficiencies therein within ten calendar days of receipt of such an application. If the community development director determines an application is not complete, he shall notify the applicant in writing of said deficiencies. Upon resubmission of the application, the initial 10-day period shall not be counted towards the review period defined herein. The community development director shall have an additional ten calendar days to notify applicant of any other deficiencies in the re-submitted application. To the extent additional information is required after resubmission, the time required for an applicant to provide such information shall not be counted toward the review period set forth herein. If the application remains incomplete after the second resubmission, said incompleteness may serve as valid reason for denial of the application. (4) The community development director must grant or deny an administrative permit within 60 days of the filing of a completed application for any small cell co-location and any co-location that does not substantially increase the size of the facility as defined in section 27-150, and within 90 days of the filing of a completed application for a new small cell facility structure and antenna. If a denial is issued, said denial must be in writing and include specific reason(s) for same as found in this section and based on substantial evidence in the record. (5) For applications requiring a special use permit, the procedure of article V, division III of the zoning ordinance must be utilized with the exception that the decision by the mayor and city council must be made within 150 days of the filing of a completed application and shall be in writing and based on substantial evidence in the record. (6) Decisions of the community development director denying an administrative permit may be appealed in accordance with the procedures and conditions in chapter 27, article V, division 8. (Ord. No. 2019-12-20, § 1, 12-9-2019; Ord. No. 2021-09-14, § X, 9-27-2021)