(a) Access to the right-of-way. The city shall not require any telecommunications facility owner to sign an agreement of any kind as precondition for access to the city's right-of-way. The provisions of this section and the ACT shall serve as the only pre-conditions for location of telecommunication facilities in the rights-of-way. Any telecommunications facility owner may, voluntarily, enter into any such right of way access agreement with terms that deviate from the provisions of the ACT or this section, so long as said agreements are available for public inspection and are non-discriminatory as to terms and conditions with different telecommunication facility owners. (b) Fees. (1) Application fee for co-location of a small cell installation on an existing pole: $100.00 for each facility. (2) Application fee for each replacement pole with an associated small cell installation: $250.00. (3) Application fee for each new pole with an associated small cell installation: $1,000.00 per pole. (4) Right of way occupancy rate: a. Co-located small cell installation on existing or replacement pole: $100.00 per year. b. New pole with associated small cell installation: $200.00 per year. (5) Annual attachment rate for poles owned by the city: $40.00 per year per small cell installation. (6) On January 1, 2021, each of the fees delineated above shall increase 2.5 percent annually. (c) Contents of application. (1) The application pursuant to this section shall be submitted to the community development director and contain the following: a. The applicant's name, address, telephone number, and email address, including emergency contact information; b. The names, addresses, telephone numbers, and email addresses of all consultants, if any, acting on behalf of the applicant with respect to the filing of the application. c. A general description of the proposed work and the purposes and intent of the proposed facility. The scope and detail of such description shall be appropriate to the nature and character of the physical work to be performed, with special emphasis on those matters likely to be affected or impacted by the physical work proposed. d. Detailed construction drawings regarding the proposed use of the public right-of-way. e. To the extent the proposed installation involves co-location on a pole, decorative pole, or support structure, a structural report performed by a duly licensed engineer evidencing that the pole, decorative pole, or support structure will structurally support the co-location, or that the pole, decorative pole, or support structure may and will be modified to meet structural requirements, in accordance with applicable codes. f. Visual depictions or representations if such are not included in the construction drawings. g. Information indicating the horizontal and approximate vertical location, relative to the boundaries of the right-of-way, of the small cell installation for which the application is being submitted. h. If the application is for the installation of a new pole or decorative pole, a certification that the applicant has determined, after diligent investigation, that it cannot meet the service objectives of the permit by co-locating on an existing pole or support structure on which: 1. The applicant has the right to co-locate subject to reasonable terms and conditions; and 2. Such co-location would not impose technical limitations or significant additional costs. The applicant shall certify that it has made such a determination in good faith, based on the assessment of a licensed engineer, and shall provide a written summary of the basis for such determination. i. A certification that the applicant has permission from the owner to colocate on the structure or pole. j. If the applicant is not provider of wireless services, a certification that a wireless service provider has requested in writing that the applicant co-locate the small cell installation or install, modify, or replace the pole or decorative pole at the requested location. (2) Any material change to information contained in an application shall be submitted in writing to the community development director within 30 days after the events necessitating the change. Failure to do so shall be a violation of this section. (d) Exemption from permit. (1) An application shall not be required for the following activities, provided that applicable electrical or encroachment permits may still be required pursuant to the provisions of the City Code: a. With respect to a pole or decorative pole on which the small cell installation is co-located, inspections, testing, repairs and modifications that maintain functional capacity and aesthetic and structural integrity, provided that modifications are limited by the structural load analysis supplied by the applicant in its prior application for installation of the facility; and b. Inspections, testing, or repairs that maintain functional capacity or the replacement or upgrade of antennas or other components of the small wireless installation such as a swap out or addition of antennas and radio equipment as required by the applicant, with antennas and other components that are substantially similar in color, aggregate size, and other aesthetics to that previously permitted by the city and consistent with the height and volume limits for wireless installations under this section, so long as the pole, decorative pole, or support structure will structurally support, or prior installation will be modified to support, the structural load in accordance with the structural load analysis supplied by the applicant in its prior application for the installation. (2) A permit shall not be required for the installation, placement, maintenance, operation or replacement of micro wireless facilities that are suspended on cables that are strung between poles or support structures in the right-of-way in compliance with applicable codes, subject to the requirement that other applicable permits, such as electrical, excavation, street closure, or as otherwise required by this Code, be obtained. (e) Procedure after submission of application. (1) Within 20 days of receipt of a written application pursuant to this section, the community development director shall: a. Notify the applicant in writing of the commencement and completion dates of any widening, repair, reconstruction, or relocation of the applicable right-of-way that is scheduled to commence, or is anticipated in good faith to commence, within 24 months after the application is filed; b. Notify the applicant of any aspect of the application that appears to be grounds for the denial of the application pursuant to this section; and c. Determine whether the application is complete and inform the applicant of his determination in writing. (2) If the application is deemed incomplete, the community development director shall specifically identify in writing all missing information within such 20-day period. (3) If notified of incompleteness, the applicant may submit such missing information within 20 days of the receipt of the notification from the community development director, and, upon resubmission, any subsequent review for completeness shall be limited to the previously missing information. If the application remains incomplete or is materially changed other than to address the missing information, the community development director shall notify the applicant of such within ten days of the resubmission and such notice shall constitute an official denial of the application. (f) Time for review. (1) Within 30 days of the city's written determination that the application is complete, or upon it becoming complete by operation of law 20 days after submission, for a co-location, and within 70 days for installation, modification or replacement of a pole or decorative pole, the community development director shall make the determination whether to approve or deny the application. (2) A decision to deny the application shall be in writing, shall identify all reasons for denial, and shall identify the provision(s) of this section on which the denial was based. (3) If the community development director fails to act on an application within the review period provided in this section, the applicant may provide the city written notice that the time period for acting has lapsed, and the community development director shall then have 20 days after receipt of said notice to render a written decision. If the community development director does not act within that additional 20 days, the application shall be deemed to be approved by operation of law. (g) Standards of review. The community development director shall approve the application unless the co-location of a small cell installation or requested installation, modification, or replacement of a pole or decorative pole: (1) Interferes with the operation of traffic control equipment; (2) Interferes with the sight lines or clear zones for transportation or pedestrians; (3) Fails to comply with the Americans with DisabilitiesAct, 42 U.S.C. section 12101, et. seq., or similar laws of general applicability regarding pedestrian access or movement; (4) Requests that ground-mounted equipment be located more than 7.5 feet in radial circumference from the base of the pole, decorative pole, or support structure to which the antenna would be attached, provided that this shall not serve as reason for denial if the applicant can show that the greater distance is neces- sary to avoid interfering with sight lines or clear zones for transportation or pedestrians or to otherwise protect public safety; (5) Fails to comply with applicable codes; (6) Fails to comply with the maximum limitations of what is defined as a small cell installation under this article or otherwise refuses to locate the facilities underground in those areas where the city requires same of all utilities in the rightof-way; (7) With respect to an application to install a pole or decorative pole, interferes with the widening, repair, reconstruction, or relocation of a public road or highway by the city or GDOT that has been advertised for bid and scheduled for completion within six months after the application is filed; (8) With respect to an application to install a pole or decorative pole, interferes with a public works construction project governed by O.C.G.A. ยง 36-91 and scheduled for completion within six months after the application is filed; (9) Fails to comply with aesthetic requirements or alternate location requirements of this section; (10) Fails to comply with laws of general applicability that address pedestrian and vehicular traffic and safety requirements; or (11) Fails to comply with laws of general applicability that address the occupancy or management of the right-of-way and that are not otherwise inconsistent with this article or the ACT. (h) Expiration of permit. The co-location, installation, modification or replacement for which a permit is issued under this section shall be completed within six months after issuance, provided that the city shall grant an extension for up to an additional six months upon written request made before the expiration of the initial 6-month period if a delay results from circumstances beyond the reasonable control of the applicant. (i) Relocation, recondition and replacement. (1) If the city requires any widening, repair, reconstruction, or relocation of a public road or highway, or relocation of poles, support structures, or small cell installations as a result of a public project, the telecommunication facility owner shall relocate poles and support structures that have been installed in the right-ofway at no cost to the city in case said poles and support structures are found to unreasonably interfere with the widening, repair, reconstruction or relocation project or the public project. The telecommunication facility owner shall relocate the poles or support structures: a. By the date designated in a written notice by the city that contains a good faith estimate of the date by which the city intends to commence work so long as the time frames are applied to all utilities in the right-ofway, provided, however, that the date designated for relocation shall be at least 45 days after the city provides written notice of same; or b. Within the time frame that the telecommunication facility owner estimates in good faith is reasonably needed to complete the relocation, so long as such good faith estimate is provided to the city in writing within 30 days following receipt of the city's written notice and explains in detail why such relocation cannot be reasonably completed by the date designated by the city. (2) The telecommunication facilities owner shall reasonably cooperate with the city to carry out reconditioning work activities for any poles or decorative poles owned by the city in a manner that minimizes interference with the approved use of the facility. The city shall use reasonable effort to provide the telecommunication facility owner with written notice of reconditioning work at least 120 days before such work begins. Upon receiving such notice, it shall be the telecommunication facility owner's sole responsibility to provide adequate measures to cover, remove, or otherwise protect the facility from the consequences of the reconditioning work, including but not limited to paint and debris fallout. The city reserves the right to require removal of all facilities from the city's pole and surrounding premises during reconditioning work, provided that the requirement to remove such is contained in the written notice required herein. All costs associated with the protection measures shall be the sole responsibility of the telecommunication facility owner. (3) In the case of the city needing to replace its poles or decorative poles, the city shall provide the telecommunication facility owner with at least 120 days written notice of same before the city may remove the facility. The city shall promptly notify the telecommunication facility owner when the poles have been replaced and the equipment can be reinstalled. During the replacement work, the telecommunication facility owner may maintain a temporary communications facility on the property, or, after approval by the city, on any land owned or controlled by the city in the vicinity of the property. (4) If the telecommunication facility owner fails to relocate a support structure as required in this section, or fails to provide a good faith estimate of the time needed to relocate, the city shall have the right, ten days after written notice of same, to cut power or move any support structure or pole located in the right-ofway as the city may determine to be necessary, appropriate, or useful in order to commence work on the public project. (j) Public safety. (1) An applicant in the public right-of-way shall employ due care during the installation and maintenance process and shall comply with all safety and public right-ofway protection requirements in the city codes and regulations and State Law. (2) An applicant or permittee pursuant to this section shall not place any small cell installations, support structures, poles or decorative poles where they will interfere with any existing infrastructure or equipment and shall locate its lines and equipment in such a manner as not to interfere unnecessarily with the usual vehicular or pedestrian traffic patterns or with the rights or reasonable convenience of owners of property that abuts any public right-of-way. (3) If the city determines that a telecommunication facility owner's activity in the public right-of-way pursuant to this section creates an imminent risk to public safety, the city shall provide written notice to the facility owner requiring the facility owner to address said risk. If the facility owner fails to address the issue within 24 hours of the written notice, the city shall be authorized to address said issue at the facility owner's expense. (4) Any damage to the public right-of-way caused by the activities of the telecommunication facility owner while occupying, installing, repairing or maintaining small cell installations, poles, or support structures shall be repaired promptly by the facility owner. If the facility owner fails to conduct such repairs within 90 days of receipt of a written notice from the city notifying the facility owner of the damage to the right-of-way, the city shall be authorized to correct and repair the damage at the facility owner's expense, plus a $500.00 penalty. Failure of the facility owner to pay the city's expenses under those circumstances, as well as the penalty, shall result in the facility owner being prohibited from applying for, or receiving, any further permits under this section until the full amount is paid to the city. (k) Alternate locations. For application for new poles in the public right-of-way in areas zoned for residential use, the city may propose an alternate location in the public right-of-way within 100 feet of the location set forth in the application, and the applicant shall use the city's proposed alternate location unless the location imposes technical limits or significant additional costs, a fact the applicant must certify to have determined in good faith, based on the assessment of a licensed engineer, and shall provide a written summary of the basis for such determination. (l) First come, first served requests. If multiple applications are received by the city to install two or more poles or decorative poles at the same location or to co-locate two or more small cell installations on the same pole, decorative pole or support structure, the applications shall be considered in the order they were received once deemed complete and, if a permit is granted for the first completed application, the subsequent completed applications for the same location shall be deemed to be automatically denied.