Dunwoody · Zoning Ordinance
Appendix A - EXPIRED AND OBSOLETE ZONING DISTRICTS / Chapter 32 - UTILITIES / Article IV - SEWERS AND SEWAGE DISPOSAL / Division 3 - BUILDING SEWERS AND CONNECTIONS
Sec. 32-263. Location of building sewer and building drain.
About this text
- As published by Municode, current through 2020-02-10
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Unless otherwise authorized in writing by the department, the building sewer shall be brought to the building at an elevation below the basement floor. In all buildings in which a building drain is too low to permit gravity flow to the
public sanitary sewer, sewage carried by this drain shall be lifted by an approved sewage ejector to a height to permit gravity flow. All sewage ejector installations shall be approved by the county.
History
(Comp. Ords. 2008, ch. 25, art. III, div. 3, § 4)
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.