The department may require pretreatment of wastewater to an acceptable condition before discharge to the public sanitary sewer system when wastewater contains the substances or possesses the characteristics of prohibited or limited discharges. Pretreatment may also be required if these wastewaters cause upset, interference or pass through at the POTW or have a deleterious effect upon any other aspect of public welfare, either alone or in combination with other discharges. In addition to lowering the concentrations of substances to an acceptable level through pretreatment or altering the characteristics of a wastewater, the department may require additional controls before discharge to the public sanitary sewer system. In particular, quantities or rates of discharge shall be altered so that the discharge becomes more compatible with the sewer system. Expenses incurred in the installation and operation of these controls shall be borne by the industrial user.