--- title: Dunwoody Zoning Ordinance, Sec. 32-333. Measurements, tests and analyses, and sample collection collection: local-codes id: local-code:dunwoody/zoning/32-333 cite_as: Dunwoody, Ga., Zoning Ordinance § 32-333 canonical_url: https://georgiacommons.org/code/local/dunwoody/zoning/32-333 md_url: https://georgiacommons.org/code/local/dunwoody/zoning/32-333.md text_url: https://georgiacommons.org/code/local/dunwoody/zoning/32-333/text source_url: https://library.municode.com/ga/dunwoody date: 2020-02-10 status: active jurisdiction: city:dunwoody jurisdiction_name: Dunwoody place_fips: "1324768" corpus_version: local-codes-dunwoody-12eb400a5ad6 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/dunwoody/zoning/~appendix-a/~chapter-32/~article-iv/~division-5.md previous: https://georgiacommons.org/code/local/dunwoody/zoning/32-332.md next: https://georgiacommons.org/code/local/dunwoody/zoning/32-334.md index: https://georgiacommons.org/code/local/dunwoody.md branch: zoning edition: As published by Municode, current through 2020-02-10 edition_date_kind: current_through source_publisher: Municode version_id: local-code:dunwoody/zoning/32-333@2020-02-10-34a065c57f --- # Dunwoody Zoning Ordinance, Sec. 32-333. Measurements, tests and analyses, and sample collection > As published by Municode, current through 2020-02-10 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - EXPIRED AND OBSOLETE ZONING DISTRICTS / Chapter 32 - UTILITIES / Article IV - SEWERS AND SEWAGE DISPOSAL / Division 5 - DISCHARGE REGULATIONS (a) Any measurements, tests, analyses, sample types, sample containers and/or holding times to which reference is made in this chapter shall be determined in accordance with procedures and specifications as set forth in 40 CFR 136, unless otherwise specified in an applicable categorical pretreatment standard. If 40 CFR 136 does not contain sampling or analytical techniques for the pollutant in question, sampling and analyses must be performed in accordance with procedures approved by EPA. (b) Analyses shall be determined at the control manhole, or upon a suitable sample taken at the control manhole. If no control manhole is available on the building sewer, the control manhole shall be considered the nearest downstream manhole to which the building sewer is directly connected. When the director deems it necessary, the owner of any property served by a building sewer carrying industrial wastes shall install a suitable control manhole on the building sewer to facilitate observation and sampling of wastes. This manhole, when required, shall be accessible, safely located, and constructed at the owner's expense in accordance with county specifications. (c) Except as indicated in subsection (d) of this section, the user must collect wastewater samples using flow proportional composite sampling techniques. In the event flow proportional sampling is infeasible, the director may authorize the use of time proportional sampling or a minimum of four grab samples where the user demonstrates that this will provide a representative sample of the effluent being discharged. In addition, grab samples may be required to show compliance with instantaneous discharge limits. (d) Samples for oil and grease, temperature, Ph, cyanide, phenols, sulfides, and volatile organic compounds must be obtained using grab collection techniques. ## History (Comp. Ords. 2008, ch. 25, art. III, div. 5, § 11)