(a) All interior FOG interceptors shall: (1) Be a minimum of 100 pounds in capacity as defined by the Plumbing Drainage Institute; (2) Be made of corrosion-resistant coated metal; (3) Be properly sized based on the results of an inspection and FOG evaluation; (4) Contain properly installed and functioning baffle walls and other flow control devices necessary to achieve the appropriate retention time; (5) Have at least a 30-minute interior retention time before gray water is discharged into the sewer system; (6) Tie all of the fresh air fixtures to the FOG interceptor; (7) Have a 15-foot distance between the FOG interceptor and the last fresh air fixture and have a proper flow control device; (8) Have a temperature of discharge entering the interior FOG interceptor that does not exceed 140 degrees Fahrenheit; and (9) Be Plumbing Drainage Institute rated, be accessible for inspection, and be installed in accordance with the manufacturer's specifications by a licensed plumber and not a representative and/or an apprentice of the licensed plumber. (b) All exterior FOG interceptors shall: (1) Be a minimum of 1,000 gallons in capacity; (2) Be properly sized based on the results of an inspection and FOG evaluation; (3) Be constructed of reenforced materials suitable for load bearing and watertight to prevent inflow and infiltration; (4) Be precast with a minimum of 3,000 psi concrete per applicable American Society for Testing and Materials standards with four to seven percent air entrapment; (5) Have an invert elevation of the inlet between three inches to six inches above the invert elevation of the outlet; (6) Contain a properly installed and functioning baffle wall and other flow control devices necessary to achieve an adequate time for FOG to properly separate but not to exceed 24 hours; (7) Contain inlet and outlet T's made of schedule 40 PVC piping and at a 90- degree angle with a minimum diameter of the inlet and outlet piping to be six inches; (8) Include the outlet T six inches from the manhole cover; (9) Include T piping of the inlet and outlet that is within 18 inches of the bottom and at least five inches above the static liquid level of the tank; (10) Have the FOG interceptor set level on a consolidated, stable base so that no settling or tipping of the FOG interceptor can occur; (11) Connect all of the fresh-air fixtures to the FOG interceptor; (12) Have the outlet discharge line from the FOG interceptor directly connected to a sewer line tapped into the collection main; (13) Have solid manhole covers to prevent inflow and infiltration; (14) Have two or more manholes for entry to each chamber of hydraulic liquid mass; (15) Be accessible for inspections and have no permanent or temporary structure or container placed directly over the FOG interceptor or installed in areas subject to traffic; and (16) Be installed by a licensed plumber. (c) The contents of any fryer oil containers shall not be mixed with any other FOG interceptor waste or any other nontoxic or toxic substances.