Dunwoody · Zoning Ordinance

Appendix A - EXPIRED AND OBSOLETE ZONING DISTRICTS / Chapter 32 - UTILITIES / Article II - DEKALB COUNTY WATER SYSTEM / Division 2 - EXTENSIONS OF SERVICE

Sec. 32-64. Requests for installation of water mains on existing city roads.

About this text

  • As published by Municode, current through 2020-02-10
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) A request for the installation of a water main by city residents who live on existing city roads not serviced by the water system shall be presented to the city council and the board of commissioners of the county through the department on petition forms provided by the department. The petitioner shall agree to pay the service connection charge for each residence

prior to installation of the new main for use when the main is complete. This purchase will not be required if the petitioner has previously purchased a meter for the address in the petition.

(b) A maximum of 100 linear feet of water main will be installed by the county for each petitioner without charge. If additional footage is required to serve all petitioners, the petitioners shall reimburse the county for any excess footage at the per-linear-foot charge of an eightinch line based upon the actual estimated cost of construction. This sum shall be on a pro rata

basis or in a specified amount for each petitioner listed on the petition with the total of the amounts specified equaling the total reimbursable cost. Pro rata costs shall be equally divided based on the total number of petitioners rather

than on the length required to cover the frontage of each petitioner.

(c) Prior to submission of the petition, the petitioner shall be provided with cost data by the county for the total length of water main installation required. The petition shall be presented to the county at which time a preliminary design

will be prepared by the county for the water main as submitted. If a water main larger than eight inches is required to conform with plans for future water service, cost data shall be prepared for both the eight-inch and larger mains and per the agreement, the county will bear the difference in cost at that time.

(d) The department shall, before placing the petition on the agenda, coordinate with the county board of health to ascertain whether any health hazards exist in the petition area that may be alleviated or corrected by the installation of the requested water main.

(e) This information shall be presented for consideration by the city council and the county board of commissioners together with the petition and estimate of cost for review and decision.

(f) The city council may waive the provisions of this section at its discretion, particularly in those instances where the board of health has determined that a health hazard exists as a consequence of the use of private water supply systems.

History

The history line the source prints at the end of the section.

(Comp. Ords. 2008, ch. 25, art. I, div. 2, § 4)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:dunwoody/zoning/32-64@2020-02-10-0b337b28d9

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Dunwoody Zoning Ordinance, Sec. 32-64. Requests for installation of water mains on existing city roads | Georgia Commons