Skip to content
Georgia Commons
Menu

Dunwoody · Zoning Ordinance

Appendix A - EXPIRED AND OBSOLETE ZONING DISTRICTS / Chapter 32 - UTILITIES / Article II - DEKALB COUNTY WATER SYSTEM / Division 2 - EXTENSIONS OF SERVICE

Sec. 32-68. Installation of water mains in shopping centers, certain apartment and condominium developments and developments not dedicating streets to city.

About this text

  • As published by Municode, current through 2020-02-10
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Shopping centers, apartment and condominium developments of R-A5 or greater density, and similar developments which do not dedicate streets to the city, shall be served by a

master meter. In cases where fire protection is required to be installed, an eight-inch or larger fire line main may be served through an eightinch or larger master meter and potable water service taken from the fire line main within the

development. As an alternate to this, an unmetered fire line may be installed with a separate master-metered potable water service line.

Exception to the requirement for the master meter may be made when, in the opinion of the county, conditions are such that the installation of individual meters within the development would prove more feasible than serving the development by a master meter.

(b) Installation of an eight-inch or larger water main within developments shall be subject to the following conditions:

(1) Design of all lines six inches and larger shall be approved by the county, and all materials used in construction of the water main shall be in accordance with county and city specifications.

(2) All water main materials and labor shall be paid for by the developer, and installation shall be in accordance with county and city specifications and by a qualified

contractor.

(3) Per the agreement, the county shall have the full authority to inspect, test and require sterilization of all water mains. No use shall be made of such water mains

until satisfactory sterilization and tests have been completed.

History

The history line the source prints at the end of the section.

(Comp. Ords. 2008, ch. 25, art. I, div. 2, § 8)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:dunwoody/zoning/32-68@2020-02-10-63e2ceb4f8

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Dunwoody Zoning Ordinance, Sec. 32-68. Installation of water mains in shopping centers, certain apartment and condominium developments and developments not dedicating streets to city | Georgia Commons