Sec. 75-41. Schedule of building or construction permit fees.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

For the purpose of determining fees, floor area shall be the gross overall outside floor area of a building at each story, including all portions under a roof. Where a building permit fee is paid for a new building or addition, separate permits and fees shall not be required for fences, walls, awnings, masonry fence walls, site work or other components normal to building construction. Separate fees shall be paid for electrical, plumbing, mechanical, miscellaneous or other permits shown elsewhere in this schedule. Permit fees for all required permits shall be as provided in the following schedule:

(1) New buildings and additions.

a. For each square foot of enclosed area or fractional part of residential space, for each story below and above grade the fee shall be an amount listed in the schedule of fees and charges.

b. For each square foot of garage, storage building or barn space, the fee shall be an amount listed in the schedule of fees and charges.

c. For each square foot of open shed space, the fee shall be an amount listed in the schedule of fees and charges.

d. For commercial space, the fees shall be as listed in the schedule of fees and charges.

e. New construction other than buildings, including pylons, storage tank foundations, structural elements of industrial complexes not within a building, and similar construction: For each $1,000.00 of estimated cost, the fee shall be an amount listed in the schedule of fees and charges.

f. Alterations (including major repair to buildings or other structures): For each $1,000.00 of estimated cost or fractional part thereof, the fee shall be an amount listed in the schedule of fees and charges.

g. Moving buildings/mobile home on or across public thoroughfares: The fee shall be an amount listed in the schedule of fees and charges. In the case of a mobile home, this shall only apply when the move is not in conjunction with a building permit.

h. The mobile home fee, including 200-amp electrical fee shall be an amount listed in the schedule of fees and charges. Services over 200 amps shall be an amount listed in the schedule of fees and charges.

i. Masonry fences and walls: For each 50 linear feet or fractional part thereof, the fee shall be an amount listed in the schedule of fees and charges.

j. Swimming pools: For all permanent swimming pool installations above or in ground, including fencing, the fee shall be an amount listed in the schedule of fees and charges.

k. Demolition of buildings: The fee shall be an amount listed in the schedule of fees and charges. For demolition of structures other than buildings, the fee shall be an amount listed in the schedule of fees and charges.

l. Temporary permits: The fee shall be an amount listed in the schedule of fees and charges.

m. Minimum fee for any building permit, based upon the fee formulas contained in subsections (1)e through (1)m of this section shall be an amount listed in the schedule of fees and charges.

n. Golf course or recreational development area: A base fee plus a per acre fee in amounts listed in the schedule of fees and charges.

o. Development/subdivision permit: The fee shall be calculated on a per developed acre basis with a minimum charge listed in the schedule of fees and charges.

(2) Electrical permit fees. Electrical permit fees for service installations (conductors and equipment for delivering energy from the electrical utility supply system) (residential and commercial) shall be as listed in the schedule of fees and charges. Each service or sub-service requiring a utility-owned meter shall be considered a service for fee purposes.

(3) Plumbing permit fees. Plumbing permit fees for new residential or commercial service shall include a base fee and a per fixture fee in amounts listed in the schedule of fees and charges. Renovations or additions to a room shall be charged an amount listed in the schedule of fees and charges.

(4) Mechanical permit fees. Mechanical permit fees for new residential or commercial service HVAC system shall be an amount listed in the schedule of fees and charges per ton of air conditioning equipment and 20,000 Btu of heat equipment. Additions or changes of equipment shall be charged an amount listed in the schedule of fees and charges.

(5) Renewal of permits. For renewal of a permit a charge in an amount listed in the schedule of fees and charges shall be made.

(6) Re-inspection fees. Fees for re-inspection shall be an amount listed in the schedule of fees and charges.

(7) Miscellaneous permit fees. Tents for assembly, home occupation licenses and temporary camper permits shall all be charged amounts listed in the schedule of fees and charges.

History

The history line the source prints at the end of the section.

(Ord. of 3-20-2006)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:eatonton/zoning/75-41@2026-11-11-bad1414b8c

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.