Eatonton · Zoning Ordinance
Part II - CODE OF ORDINANCES / Chapter 75 - ZONING / Article VI - SIGNS
Sec. 75-512. Permits to construct or modify signs.
About this text
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(1) Application. An application for construction, creation, or installation of a new sign or for modification of an existing sign shall be accompanied by detailed drawing to show the dimension, design, structure, and location of each particular sign, to the extent that such details are not contained on a master signage plan in effect for the zone lot. One application and permit may include multiple signs on the same zone lot.
(2) Inspection. The inspector shall cause an inspection of the zone lot for which each permit for a new sign or for modification of an existing sign has been issued during the sixth month after the issuance of such permit or at such earlier date as the owner may request. If the construction is not substantially complete at the time of inspection, the permit shall lapse and become void. If the construction is complete and in full compliance with this article and with the building and electrical codes, the inspector shall affix to the premises a permanent symbol identifying the sign(s) and the applicable permit by number or other reference. If the construction is substantially complete but not in full compliance with this article and applicable codes, the inspector shall give the owner or applicant notice of the deficiencies and shall allow an additional 30 days from the date of inspection for the deficiencies to be corrected.
If the deficiencies are not corrected by such date, the permit shall lapse. If the construction is then completed, the inspector shall affix to the premises the permanent symbol described above.
(3) Lapse. In the event that a permitted sign has not been substantially completed within six months of the date of the issue of the permit, said permit shall lapse and be void and of no effect.
History
(Ord. of 3-20-2006)
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.