Eatonton · Zoning Ordinance
Part II - CODE OF ORDINANCES / Chapter 75 - ZONING / Article VII - SUBDIVISION REGULATIONS / Division 4 - PRELIMINARY PLAT REVIEW
Sec. 75-633. Preliminary plat approval.
About this text
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
After the planning and zoning commission has reviewed the preliminary plat and construction plans, the report of the building inspector, recommendations from the city and/or the sanitarian, approval from local postmaster, and testimony and exhibits submitted at the public
hearing, the applicant shall be advised of any required changes and or additions. At this time the planning and zoning commission shall approve or disapprove the preliminary plat. If approved, the preliminary plat will be signed and dated by the chairman of the planning and zoning commission, the director of planning and development, and the local postmaster. The developer may then begin the construction of the subdivision based on the approval of the preliminary plat, construction plans (land disturbance permit) and general stormwater NPDES permit. The building inspector must approve all changes prior to any work. The construction will be inspected at various stages to verify compliance with the preliminary plat.
History
(Ord. of 3-20-2006)
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.