1.6 Proper identification of the boundaries of the tract with all bearings and distances indicated. The boundary survey shall be to such a degree of accuracy that the error is not greater than 1:7,500. 1.7 Location and date of each percolation test, soil boring, and well in the proposed planned manufactured housing community. 1.8 Topographic survey by contours at vertical intervals of not more than three feet or if the property does not have a five-foot change in elevation, a certification from a professional engineer shall be required stating that the drainage from the property will not affect adjacent property owners. 1.9 Existing and proposed zoning district classification.