--- title: Effingham County Zoning Ordinance, 3.16A.10. Transportation network and road impacts collection: local-codes id: local-code:effingham-county/zoning/3.16a.10 cite_as: Effingham County, Ga., Zoning Ordinance ยง 3.16A.10 canonical_url: https://georgiacommons.org/code/local/effingham-county/zoning/3.16a.10 md_url: https://georgiacommons.org/code/local/effingham-county/zoning/3.16a.10.md text_url: https://georgiacommons.org/code/local/effingham-county/zoning/3.16a.10/text source_url: https://library.municode.com/ga/effingham_county/codes/code_of_ordinances date: 2026-08-04 status: active jurisdiction: county:effingham jurisdiction_name: Effingham County county_fips: "13103" corpus_version: local-codes-effingham-county-57fc8f0e0dd5 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/effingham-county/zoning/~appendix-c/~article-iii.md previous: https://georgiacommons.org/code/local/effingham-county/zoning/3.16a.md next: https://georgiacommons.org/code/local/effingham-county/zoning/3.17.3.md index: https://georgiacommons.org/code/local/effingham-county.md branch: zoning edition: As published by Municode, current through 2026-08-04 edition_date_kind: current_through source_publisher: Municode version_id: local-code:effingham-county/zoning/3.16a.10@2026-08-04-bd4395748a --- # Effingham County Zoning Ordinance, 3.16A.10. Transportation network and road impacts > As published by Municode, current through 2026-08-04 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix C - ZONING ORDINANCE / Article III - GENERAL PROVISIONS (a) A traffic impact study shall be required, pursuant to the county traffic impact study requirements. (b) All vehicles entering and exiting the site are subject to section 74-8, designated truck routes. (c) The property on which the shipping container facility is proposed must have frontage on a paved roads built to county or GDOT standards. (d) No shipping container facility operators or transportation partners, customers, etc., shall damage any portion of a county road or right-of-way or cause a road to become impassable or unsafe to normal passenger traffic. 3.16A.11 Minimum requirements for operating a shipping container facility using a county road access: (a) Entrance drive/road into shipping container facility property is to be paved from edge of existing road to county right-of-way or to radius point. Pavement is to be at minimum eight inches thick graded aggregate base course with three inches thick asphalt surface course. (b) Pavement section is to be 24-foot minimum width at county right-of-way, with a 30-foot radius on each side. (c) Figure 1 of this section illustrates the shipping container facility entrance road requirements. (d) A driveway culvert is to be installed if the right-of-way contains a roadside ditch or drainage swale, to allow for the continuation of drainage control along the right-of-way. (e) The shipping container facility operator must install a sign facing the county road. The sign shall include the following information: 1. Operator/company name, and 2. Operator/company phone number. (f) "Trucks Entering Road" signs are also to be installed at locations to be determined by the county engineer. A "Stop" sign is to be placed in the right-of-way to control trucks entering a county road from the shipping container facility. Figure 1 Shipping Container Facility Entrance Road Requirements (Ord. of 1-3-23(2)) 3.17 Excavation, mining, ponds, and fills of land and/or state/federal jurisdictional waters or wetlands. 3.17.1 The following activities shall be subject to review by the county planning board: 1. Excavation of land, or removal of earth that exceeds one acres of disturbed area. 2. Removal of earth or like material from the subject site to another parcel. 3. Filling of land and/or state/federal jurisdictional waters or wetlands. If two out of the three items above meets the project criteria, review by the planning board and approval by the board of commissioners is mandatory. If one of the three items above meets the project criteria, review by the county engineer or their designee is mandatory. 3.17.2 Excavation, mining, and fills of land and/or state/federal jurisdictional waters or wetlands. Excavation, mining, and fills of land and/or state/federal jurisdictional waters or wetlands that are associated with a specific project that has been approved by the board of commissioners that comply with all other regulations set forth in this ordinance are exempt from section 3.17.