1. All projects must comply with best management practices as outlined in the "Manual for Soil and Sediment Control in Georgia" as specified in O.C.G.A. § 12-7-6.

2. Side slopes of any excavated area must be constructed at a maximum of 3:1 slope (one foot in elevation change per three feet of horizontal distance) from the top of the excavation to the bottom at all times during construction and at completion of the excavation. All wet ponds must have a minimum five feet depth and a minimum ten feet width from bottom of the bank, excluding stormwater ponds.

3. All digging and hauling operations must be completed within six months. All disturbed areas will have a permanent stand of grass established at completion.

4. No digging and hauling activities shall take place except between the hours of 8:00 a.m. and 5:00 p.m., Monday through Friday for a pond less than one acre and in an R Zoning District. A project of regional significance may be permitted alternative hours of operation, upon review and approval by the county manager or his designee.

5. Unless a pond/excavation is to be shared by two or more parcels it shall be located at least 50 feet from the nearest property line. Proposed excavations shall not be nearer than 100 feet to any existing school, church, dwelling, or highway right-of-way. The location of the existing Pond may not be within 50 feet from any proposed school, church, dwelling or highway right-of-way. No pond shall be located less than ten feet from the nearest access or utility easements. Refer to the Buffer Ordinance (Section 3.4) for Buffer requirements for surface mining operations.

6. All wetland impacts must be approved by the USACE.

7. The construction entrance and roadway shall be designed and built pursuant to GSWCC Construction Exit Guidance (2016 Edition). The roadway shall extend a minimum of 50 feet into the mine site from the paved entrance.

History

The history line the source prints at the end of the section.

(Ord. of 7-5-05; Ord. of 8-2-16, § 1; Ord. of 9-15-20; Ord. of 1-3-23(1); Ord. No. 2024-348, 8-20-24)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:effingham-county/zoning/3.17.4@2026-08-04-ac69a7c6a5

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.