Skip to content
Georgia Commons
Menu

Effingham County · Zoning Ordinance

Appendix TO - ZONING ORDINANCE HOUSING ORDINANCE / Article III - DWELLINGS IN RESIDENTIAL ZONES

3.2.2. Existing development; or

About this text

  • As published by Municode, current through 2026-08-04
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

3.2.3 Proposed development in the same zoning classification or area, or as envisioned in the comprehensive plan of Effingham County.

3.2.4 Notwithstanding the criteria above, the planning board may grant a permit to place a manufactured home of less than 14 feet in width within a zoning district restricted to class A single-family detached dwellings during the construction of a site-built home. Said permit shall remain valid for a period which shall be the lessor of two years or issuance of the certificate of occupancy for the site-built home. Said permit may be extended for a period not to exceed one year upon approval of the county commission.

3.3 Process. The owner shall, prior to securing a building permit or placement of the structure, submit to the zoning administrator or designee an application containing the following:

3.3.1 Applicant's name and address and his or her representative, and the interest of every person represented in the application.

3.3.2 Documentation, which may include statements, pictures, or maps, of uses in the zoning district and the abutting district in which the structure is proposed to be placed.

3.3.3 A plat or sketch plan showing the configuration of the land on which the structure is to be placed and the location of placement, including distances of the structure from the property lines.

3.3.4 Specifications or pre-design plans which contain a complete description of the structure, including but not limited to square footage, siding material, roof material and pitch, foundation, and other evidence of the general aesthetic appearance required by the zoning administrator or designee and necessary to make a determination of compliance and compatibility as required by this ordinance.

3.3.5 Documents certifying that the structure is in compliance with the Standard Building Code, the National Manufactured Home Construction and Safety Standards, and any other codes, regulations, or manufacturing standards as required by this ordinance.

3.3.6 The applicant must carry the burden of proof to establish that the structure is compatible with surrounding structures. The criteria should include such factors as exterior material, square footage, foundation type, and other factors as deemed necessary for compliance and compatibility as required by this ordinance. The planning board shall further consider the possible negative effect of the structure on the property values of other properties in the immediate area and the possible effect the structure could have on the surrounding area in the event of inclement weather or high winds.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:effingham-county/zoning/3.2.2@2026-08-04-66f6ce2b95

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Effingham County Zoning Ordinance, 3.2.2. Existing development; or | Georgia Commons