8.2.1.1.1. Actual dimensions and shape of the lot to be built upon.

About this text

  • As published by Municode, current through 2026-08-04
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

8.2.1.1.2 Exact size and location on the lot of all buildings and other structures, if any, and the location and dimensions of proposed buildings and other structures or alterations.

8.2.1.1.3 Existing and proposed uses; show the number of families the building is designed to accommodate.

Applications for building permits shall be granted or refused within 15 days from the date of application. One copy of the plans shall be returned to the applicant marked either approved or disapproved and attested to same by the signature of the building and zoning inspector. The second copy of the plans, similarly marked, shall be filed in the office of the zoning administrator.

8.2.1.1.4 Driveways and access roads. Where any driveway or access road is to cross any drainage ditch or adjoin any public street, the party proposing to construct such driveway or access road shall submit a plan to the public works director, accompanied by a fee in the amount established by the board of commissioners.

Said plan shall show the grade, location, and design of all improvements, including the concrete culvert at the site of each such crossing. Upon receipt of a plan and the accompanying fee, the public works director shall inspect the proposed location of said driveway or access road and shall review the proposed plan. The public works director shall make such modifications to the proposed plan as deemed appropriate; however, in no event shall the diameter of any required culvert be less than 15 inches. The public works director shall inspect the installation of such driveway or access road upon completion to ensure compliance with the proposed plan. No driveway or access road that is to cross any drainage ditch or adjoin any public street shall be constructed except in accordance with plans approved by the public works director.

8.2.2 Certificate of occupancy. A certificate of occupancy shall be required prior to the occupation for use or change of use of land, building, or structure.

Application for certificate of occupancy shall be made in writing to the zoning administrator.

When use of premises involves a new building or structure, or alterations to an existing building or structure, such application shall be made at the same time application for a building permit is made.

When no construction or alteration is involved, application to occupy and use land may be made at any time. Such application shall contain all information necessary for the zoning administrator to determine whether the proposed occupation and use of land conforms to the provisions of this ordinance.

A certificate of occupancy shall not be issued by the zoning administrator unless the building inspector determines that the construction is in accordance with the plans submitted for the building permit.

An application for a certificate of occupancy shall be granted or refused within 15 days after the zoning administrator has been officially notified of (a) completion of construction, or (b) application to occupy and use land where no construction is involved.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:effingham-county/zoning/8.2.1.1.1@2026-08-04-894b2e7ee2

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Effingham County Zoning Ordinance, 8.2.1.1.1. Actual dimensions and shape of the lot to be built upon | Georgia Commons