--- title: Elbert County Zoning Ordinance, 8.02.06. Administration and enforcement collection: local-codes id: local-code:elbert-county/zoning/8.02.06 cite_as: Elbert County, Ga., Zoning Ordinance ยง 8.02.06 canonical_url: https://georgiacommons.org/code/local/elbert-county/zoning/8.02.06 md_url: https://georgiacommons.org/code/local/elbert-county/zoning/8.02.06.md text_url: https://georgiacommons.org/code/local/elbert-county/zoning/8.02.06/text source_url: https://library.municode.com/ga/elbert_county/codes/code_of_ordinances date: 2026-11-23 status: active jurisdiction: county:elbert jurisdiction_name: Elbert County county_fips: "13105" corpus_version: local-codes-elbert-county-76292434c225 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/elbert-county/zoning/~part-ii/~chapter-34/~article-iv/~division-8.md previous: https://georgiacommons.org/code/local/elbert-county/zoning/8.02.05.md next: https://georgiacommons.org/code/local/elbert-county/zoning/8.02.07.md index: https://georgiacommons.org/code/local/elbert-county.md branch: zoning edition: As published by Municode, retrieved 2026-11-23 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:elbert-county/zoning/8.02.06@2026-11-23-11c6492c4f --- # Elbert County Zoning Ordinance, 8.02.06. Administration and enforcement > As published by Municode, retrieved 2026-11-23 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 34 - UTILITIES / Article IV - ZONING / Division 8 - OVERLAY DISTRICTS / 8.02 - RIV River Corridor Protection District. (a) Site plans. Application for a local DEVELOPMENT PERMIT within the RIVER CORRIDOR shall include a site plan drawn at a scale of one inch equals 50 feet, with the following information: 1. A map of all planned excavation and fill, including calculations of the volume of cut and fill involved, cross-sectional drawings showing existing and proposed grades. Elevations, horizontal scale and vertical scale must be shown on the cross-sectional drawings. 2. A map of any RIVER CORRIDOR boundary occurring within the site must be provided. The boundary may be included on other maps provided by the APPLICANT. 3. Location, dimensions and area of all IMPERVIOUS SURFACES, both existing and proposed, on the site and adjacent to the site for a distance of 200 feet. 4. The orientation and distance from the boundaries of the proposed site to the nearest bank of an affected perennial stream or water body. 5. Elevations of the site and adjacent lands within 200 feet of the site at contour intervals of no greater than two feet, and no greater than one foot for slopes less than or equal to two percent. 6. Location and detailed design of any spill and leak collection system designed for the purpose of containing accidentally released hazardous or toxic waste. 7. All proposed temporary disruptions or diversions of local hydrology. (b) Activities to comply with site plan. 1. All development activities or site work conducted after approval of the site plan shall conform with the specifications of said site plan. Significant changes to the site plan that would alter the amount and velocity of stormwater runoff from the site, increase the amount of IMPERVIOUS SURFACE within the DEVELOPMENT, alter the overall DENSITY of DEVELOPMENT, result in a considerable increase in the amount of excavation, fill or removal of the overall appearance of the DEVELOPMENT as proposed, can be amended only with the approval of the CODE ENFORCEMENT OFFICER. Minor changes, such as the realignment of STREETS or minor ALTERATIONS to drainage STRUCTURES and other infrastructure to meet unexpected conditions are exempted from this requirement. (c) Exemption to site plan requirements. The following activities and DEVELOPMENTS are exempt from the requirements for detailed site plans: 1. Single-family detached homes constructed within a SUBDIVISION of fewer than five parcels. 2. Repairs to a facility that is part of a previously approved and permitted development. 3. Construction of minor STRUCTURES, such as sheds or additions to singlefamily residences. (d) Review procedures. The application shall be made to the CODE ENFORCEMENT OFFICER and will be reviewed within 30 days. At the time of the application, the APPLICANT shall pay a filing fee, as specified by the board of commissioners. Filing fees up to the larger of $500.00 total or $100.00 per acre may be required to evaluate the application. This fee may be used to retain expert consultants who will provide services pertaining to functional assessment, mitigation, and WETLAND boundary determinations, as deemed necessary by the CODE ENFORCEMENT OFFICER. The review period shall include the preparation of findings (approval, approval with conditions, or disapproval) by the CODE ENFORCEMENT OFFICER. If the review process is not completed within 30 days, the application is considered to be approved. (e) Permit validity. 1. If construction described in the DEVELOPMENT PERMIT has not commenced within 12 months from the date of issuance, the permit shall expire. 2. If construction described in the DEVELOPMENT PERMIT is suspended or abandoned after work has commenced, the permit shall expire 12 months after the date that work ceased. 3. Written notice of pending expiration of the DEVELOPMENT shall be issued by the CODE ENFORCEMENT OFFICER. (f) Permits. 1. All persons desiring to undertake a permitted activity within the Broad River corridor must first obtain a permit from the COUNTY. Permit applications shall be filed according to section 12.05.002 [11.05.02]. 2. Permits shall be issued only if the activity is in compliance with COUNTY regulations and other applicable state, federal, and local regulations. The COUNTY shall impose conditions on any permit necessary to ensure that any adverse impacts upon the STREET and values of the RIVER CORRIDOR are prevented or kept to a minimum. Permits shall be valid for six months. If the activity has not been completed but substantial progress has been made, one six-month extension to the permit may be granted by the board of commissioners. 3. Permits may be revoked for failure to comply with regulatory guidelines, including conditions attached to the permit.