Elbert County · Zoning Ordinance

Part II - CODE OF ORDINANCES / Chapter 34 - UTILITIES / Article IV - ZONING / Division 9 - SUPPLEMENTAL REGULATIONS

9.09.04. Administrative Approvals.

About this text

  • As published by Municode, retrieved 2026-11-23
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

The CODE ENFORCEMENT OFFICER may

administratively approve the uses listed in this section.

a. Each APPLICANT for administrative approval shall apply to the CODE ENFORCEMENT OFFICER, providing the information set forth in subsection 9.09.05(b) and

(d) of this section.

b. The CODE ENFORCEMENT OFFICER shall respond to each such application within 30 days after receiving it by either approving or denying the application. If the CODE ENFORCEMENT OFFICER fails to respond to the APPLICANT within said 30 days, then the application shall be deemed to be approved.

c. In connection with any such administrative approval, the CODE ENFORCEMENT OFFICER may, in order to encourage shared use, administratively waive any zoning DISTRICT SETBACK requirements by up to 50 percent.

d. If administrative APPROVAL is denied, the APPLICANT may appeal said denial in accordance with the provisions of this article concerning appeals of administrative decisions.

e. Specific administratively approved uses. The following uses may be approved by the CODE ENFORCEMENT OFFICER after conducting an administrative review:

1. Installing an ANTENNA on an existing STRUCTURE other than a TOWER (such as a BUILDING, SIGN, light pole, water TOWER, or other freestanding nonresidential STRUCTURE) that is less than 50 feet in HEIGHT, so long as such addition does not add more than 20 feet to the HEIGHT of the existing

STRUCTURE;

2. Installing an ANTENNA on an existing TOWER of any HEIGHT, including a preexisting TOWER and further including the placement of additional BUILDINGS or other supporting equipment used in connection with said ANTENNA, so long as the addition of said ANTENNA adds no more than 20 feet to the HEIGHT of said existing TOWER.

3. Locating any ALTERNATIVE TOWER STRUCTURE in a zoning DISTRICT other than industrial or heavy commercial that in the judgment of the CODE ENFORCEMENT OFFICER is in conformity with the goals set forth in

subsection 9.09.03(a) of this section;

4. Locating any TOWER in a zoning DISTRICT other than industrial or commercial, provided a licensed PROFESSIONAL ENGINEER certifies, the TOWER can structurally accommodate the number of share users proposed by the APPLICANT; the CODE ENFORCEMENT OFFICER concludes the TOWER is

in conformity with the goals set forth in section 9.09.03(a) and the requirements of subections 9.09.02(4) through (6) of this section; the TOWER is to be set back from any existing off-site residence a distance equal to the HEIGHT of the TOWER; and that the TOWER meets the following HEIGHT and usage criteria:

a. For a single user, up to 90 feet in HEIGHT;

b. For two users, up to 120 feet in HEIGHT; and

c. For three and more users, up to 150 feet in HEIGHT.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:elbert-county/zoning/9.09.04@2026-11-23-88c180bb5e