--- title: Emerson Zoning Ordinance, Sec. 8.107. Application procedures collection: local-codes id: local-code:emerson/zoning/8.107 cite_as: Emerson, Ga., Zoning Ordinance ยง 8.107 canonical_url: https://georgiacommons.org/code/local/emerson/zoning/8.107 md_url: https://georgiacommons.org/code/local/emerson/zoning/8.107.md text_url: https://georgiacommons.org/code/local/emerson/zoning/8.107/text source_url: https://library.municode.com/ga/emerson/codes/code_of_ordinances date: 2026-11-11 status: active jurisdiction: city:emerson jurisdiction_name: Emerson place_fips: "1327344" corpus_version: local-codes-emerson-bab15eef4728 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/emerson/zoning/~appendix-a/~article-vii/~division-1.md previous: https://georgiacommons.org/code/local/emerson/zoning/8.106.md next: https://georgiacommons.org/code/local/emerson/zoning/8.108.1.md index: https://georgiacommons.org/code/local/emerson.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:emerson/zoning/8.107@2026-11-11-f7a539af13 --- # Emerson Zoning Ordinance, Sec. 8.107. Application procedures > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - ZONING / Article VII - REGULATED USES / Division 1 - TELECOMMUNICATIONS TOWERS AND ANTENNAS 8.107.1 General application requirements. Application for a permit for any telecommunications facility shall be made to the city by the person, company or organization that will own and operate the telecommunications facility. An application will not be considered until it is complete. The administrator is authorized to develop application forms to assist in providing the required information and facilitate the application process. Except for a co-location information submittal under section 8.107.2 of this division, the following information shall be submitted when applying for any permit required by this division and must be submitted for an application to be considered complete: A. Site plan or plans to scale specifying the location of telecommunications facilities, transmission building and/or other accessory uses, access, parking, fences, landscaped areas, and adjacent land uses. B. Landscape plan to scale indicating size, spacing, and type of plants required in section 8.106.8. C. A full description of the environment surrounding the proposed telecommunications facility, including any adjacent residential structures and districts, structures and sites of historic significance, streets capes or scenic view corridors. D. A description of anticipated maintenance needs for the telecommunications facility, including frequency of service, personnel needs, equipment needs, and traffic, noise or safety impacts of such maintenance. E. Reports from a professional qualified engineer licensed in the State of Georgia, or other appropriate qualified industry expert(s) documenting the following: i. Tower or antenna type, height, and design; ii. Engineering, economic, and other pertinent factors governing selection of the proposed design; iii. Total anticipated capacity of the telecommunications facility, including numbers and types of antennas, which can be accommodated; iv. Evidence of structural integrity of the tower or alternative tower structure; v. Structural failure characteristics of the telecommunications facility and demonstration that site and setbacks are of adequate size to contain debris; and vi. Certification that the antenna(s) and related equipment or appurtenances comply with all current regulations of the FCC, with specific reference to FCC regulations governing non-ionizing electromagnetic radiation (NIER), and that the radio frequency levels meet the American National Standards Institute (ANSI) guidelines for public safety. F. Identification of the geographic service areas for the subject installations, including a map showing the site and the nearest or associated telecommunications facility sites within the network. Describe the distance between the telecommunications facility sites. Describe how this service area fits into and is necessary for the service network (i.e., whether such antenna or tower is needed for coverage or capacity. G. If the proposed site is zoned residential or commercial, applicants must describe why an alternate site zoned LI or HI was not proposed by identifying: i. What good faith efforts and measures were taken to secure such an alternate site; ii. Why such an alternate site was not technologically, legally or economically feasible and why such efforts were unsuccessful; and iii. How and why the proposed site is essential to meet service demands for the geographic service area. The department will review special care justifications that appeal only to undue expense and/or to undue difficulties in entering into a lease agreement. The department shall carefully weight such claims and the evidence presented in favor of them, against a project's negative impacts at the proposed site. H. The applicant must provide a utilities inventory showing the locations of all water, sewage, drainage and power line easements impacting the proposed tower site. I. The applicant must provide any other information, which may be requested by the department to fully evaluate and review the application and the potential impact of a proposed telecommunications facility. 8.107.2 Tower co-location information submittals. Any person or entity co-locating an antenna or antennas which will add no more than ten feet to the height of the tower and related equipment or appurtenances on or around a tower for which a permit has already been issued shall submit the following information only: 1. The name of the person or entity co-locating the antenna. 2. The name of the owner of the tower. 3. The tower's permit number. 4. The location of the tower. 5. The remaining structural capacity of the tower. 6. Certification that the antenna(s) and related equipment or appurtenances comply with all current regulations of the FCC, with specific reference to FCC regulations governing nonionizing electromagnetic radiation (NIER), and that the radio frequency levels meet the American National Standards Institute (ANSI) guidelines for public safety.