--- title: Emerson Zoning Ordinance, 8.109.1. General collection: local-codes id: local-code:emerson/zoning/8.109.1 cite_as: Emerson, Ga., Zoning Ordinance ยง 8.109.1 canonical_url: https://georgiacommons.org/code/local/emerson/zoning/8.109.1 md_url: https://georgiacommons.org/code/local/emerson/zoning/8.109.1.md text_url: https://georgiacommons.org/code/local/emerson/zoning/8.109.1/text source_url: https://library.municode.com/ga/emerson/codes/code_of_ordinances date: 2026-11-11 status: active jurisdiction: city:emerson jurisdiction_name: Emerson place_fips: "1327344" corpus_version: local-codes-emerson-bab15eef4728 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/emerson/zoning/~appendix-a/~article-vii/~division-1.md previous: https://georgiacommons.org/code/local/emerson/zoning/8.108.6.md next: https://georgiacommons.org/code/local/emerson/zoning/8.110.md index: https://georgiacommons.org/code/local/emerson.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:emerson/zoning/8.109.1@2026-11-11-ad9d3bba39 --- # Emerson Zoning Ordinance, 8.109.1. General > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - ZONING / Article VII - REGULATED USES / Division 1 - TELECOMMUNICATIONS TOWERS AND ANTENNAS / 8.109 - Conditional use permit required. A. If the proposed location, height, setback or other aspect of a proposed tower or antenna cannot comply with the minimum requirements established in this division, then a conditional use permit shall be required for the construction of a tower or the placement of an antenna in any zoning district. All such uses shall comply with requirements set forth in this division and all other applicable codes and ordinances, unless the applicant can show that the denial of a permit is such a location will cause a significantly harmful and permanent degradation of service which cannot be overcome by any other means including planned or potential locations which would provide the same or similar coverage or capacity. B. In granting a conditional use permit, the governing authority may impose conditions to the extent that it concludes such conditions are necessary to minimize adverse effects from the proposed tower on adjoining or nearby properties as set out in section 8.109.5. 8.109.2 Application, contents, fee. All applications for conditional use permits shall be submitted to the City of Emerson zoning administrator. Each application shall contain as a part thereof detailed plans and specifications as set forth in this division. An application for a conditional use permit shall not be accepted for processing without the required information. An application fee shall be charged as set forth in the City of Emerson fee schedule. 8.109.3 Co-location of antennas required. Applicants for the erection of a tower or antenna, except amateur radio operators, shall be required to co-located upon an existing tower structure. An exception to co-location shall only be made if the applicant adequately demonstrates that an existing tower suitable for co-location does not exist in the geographic antenna placement area, and that no suitable alternative tower structure is available as set forth in section 8.106.3 contained herein. 8.109.4 Independent expert review. The governing authority may engage a licensed professional engineer as an independent expert to review any of the materials submitted by an applicant for a conditional use permit and render an opinion regarding any concerns about the proposal, including but not limited to, structural integrity and the feasibility of alternative sites or co-location. Following the review of an independent expert, the governing authority shall convey its concerns to the applicant in writing and shall allow the applicant a reasonable opportunity to address those concerns. If the applicant is unable to satisfactorily address those concerns, the applicant shall be allowed a reasonable amount of time, not to exceed 30 days, following the receipt of the letter, in which to modify the application to alleviate the governing authority's concerns or withdraw the application altogether. The expert's opinion shall be considered determinative, unless the applicant agrees to pay the expenses of submitting both opinions for a peer review, which review shall then be considered final. If the independent third-party expert supports the applicant's expert, then the department shall pay the expenses of said third-party expert. If the independent third-party expert supports the position of the department, then the applicant shall pay the expenses of said third-party expert. No permit shall issue until the applicant has paid all expenses incurred under this section. 8.109.5 Considerations in approval or denial of conditional use permits. Any denial of a request to place, construct or modify a telecommunications facility shall be in writing and supported by substantial evidence contained in a written record. The following factors may be taken into consideration in acting upon a conditional use permit application under the provisions of this division: A. The height and setbacks of the proposed tower or antenna(s); B. The proximity of the tower or antenna(s) to residential structures and residential district boundaries; C. The nature of uses on adjacent and nearby properties; D. The surrounding topography; E. The surrounding tree coverage and foliage; F. The design of the tower or antenna(s), with particular reference to design characteristics that have the effect of reducing or eliminating visual obtrusiveness; G. The proposed ingress and egress; H. The availability of suitable existing towers or other structures for antenna co-location; I. The impact of the proposed tower or antenna(s) upon scenic views and visual quality of the surrounding area; J. The needs of the applicant as balanced against the detrimental effects on surrounding properties; K. The impact of the proposed tower or antenna(s) on adjacent and nearby properties. 8.109.6 Requirements for issuance of conditional use permit. The conditional use permit may be issued by the governing authority only upon satisfaction of the following requirements: A. A proper application filed in accordance with the requirements of section 8.107; B. The application is otherwise in compliance with the conditions for the proposed conditional use required by this section; C. The applicant complies with the conditions proposed by the governing authority for the purpose of reducing the harmful effects of the use on surrounding uses and ensuring compatibility with surrounding uses; D. The governing authority determines that the benefits and need for the proposed conditional use are greater than any possible depreciating effects or damages to neighboring or nearby properties; and E. All fees, including expert fees, have been paid in full. 8.109.7 Resubmitted of conditional use application. An application for a conditional use permit which has been denied shall not be resubmitted for a period of 12 months and then only if the applicant can document a substantial change in need for a tower or antenna at the same location.