Emerson · Zoning Ordinance
Appendix A - ZONING / Article VII - REGULATED USES / Division 5 - SOLID WASTE MANAGEMENT FACILITY
Sec. 8.177. Environmental protection and location standards.
About this text
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
A. All landfills shall comply with the liner and leachate collection requirements as provided by the Georgia Environmental Protection Division. At a minimum:
1. Liners and leachate collection systems: new landfill units and lateral expansions shall be constructed with liners and leachate collection systems. The liner and leachate collection system must ensure that the concentration values listed in Table 1 below will not be exceeded in the uppermost aquifer at the relevant point of compliance. The liner and leachate collection system must be designed and installed under the supervision of a professional engineer registered to practice in Georgia who shall certify the installation.
TABLE 1
Chemical MCL (mg/l) Arsenic 0.05 Barium 1.0 Benzene 0.005 Cadmium 0.01 Carbon tetrachloride 0.005 Chromium (hexavalent) 0.05 2, 4-Dichlorophenoxy acetic acid 0.1 1, 4-Dichlorobenzene 0.075 1, 2-Dichloroethane 0.005 1, 1-Dichloroethylene 0.007 Endrin 0.0002 Fluoride 4 Lindane 0.004 Lead 0.05 Mercury 0.002 Methoxychlor 0.1 Nitrate 10 Selenium 0.01 Silver 0.05 Toxaphene 0.005 1, 1, 1-Trichloromethane 0.2 Trichloroethylene 0.005 2, 4, 5-Trichlorophenoxy acetic acid 0.01 Vinyl chloride 0.002
2. The liner and leachate collection system, shall at a minimum, be designed with the following: a composite liner (which means a system consisting of two components: an upper component consisting of at least a 30-mil flexible membrane liner (FML) and a lower component consisting of at least a two-foot layer of compacted soil with a hydraulic conductivity of no more than 1 x 10 cm/sec. FML components consisting of high density polyethylene (HDPE) shall be at least 60-rail thick. The FML component must be installed in direct and uniform contact with the compacted soil component) and a leachate collection system that is designed and constructed to maintain less than a 30-centimeter depth of leachate over liner and at least a five-foot separation between the synthetic liner and the seasonal high groundwater elevation.
3. Hazardous wastes, as defined in O.C.G.A. § 12-8-62(10) as may be amended from time to time, are prohibited.
B. Location standards.
1. In all discussions concerning compliance with the requirements of this division, the point at which determination of compliance is made (relevant point of compliance) shall be no more than 150 meters from the waste management unit boundary and shall be located on land owned by the owner of the solid waste management facility. In determining the relevant point of compliance, the following factors, at a minimum, shall be considered: hydrogeologic characteristics of the facility and surrounding land; the volume and physical and chemical characteristics of the leachate; the quantity, quality and direction of flow of groundwater; the proximity and withdrawal rate of the groundwater users; the availability of alternative drinking water supplies;
the existing quality of the groundwater, including other sources of contamination and their cumulative impacts on the groundwater and whether groundwater is currently used or reasonably expected to be used for drinking water; the effects on public health, safety, and welfare; the capability of the owner and the operator.
2. Minimum acreage for a new landfill shall be 1,000 acres.
3. No new landfill or lateral expansion of an existing landfill shall be located within one mile of the outer boundary of a significant groundwater recharge area.
4. No solid waste management facility shall be constructed within a 200-foot buffer on both sides of a perennial stream. No impervious surface shall be constructed within 300 feet of either side of the stream.
5. No solid waste management facility shall be located in a 500-foot buffer around water supply reservoirs.
6. No solid waste management facility shall be located within two miles of any surface water intake point.
7. No new landfill or lateral expansion of an existing landfill shall be located in wetlands or within 250 feet of a wetland.
8. No solid waste management facility may be located in any 100-year flood plain. No solid waste landfill may be located within 250 feet of a 100-year flood plain.
9. No new landfill or lateral expansion of an existing landfill shall be located in a seismic impact zone.
10. No new landfill or lateral expansion of an existing landfill shall be located in unstable areas.
11. No new landfill or lateral expansion of an existing landfill shall be located within 200 feet of a fault that has had displacement during the Holocene era.
12. No solid waste management facility may be located within 500 feet of a residentially-used parcel or subdivision, school or college, or public park. No solid waste management facility may be located within 200 feet of any property line.
13. No disposal area shall interfere with the established natural flow of surface waters to the detriment or damage to adjoining public or private properties. The city council shall have the right to require the applicant to construct adequate sediment basins if it appears that substantial water or sediment may be carried into any nearby property or state waters.
14. Prior to commencing any landfill operation within the municipal limits, the owner/operator of the proposed landfill shall obtain a water sample from all state waters and from all water supply wells located within two miles of the outmost boundaries of the site on which the landfill is located. Said water sample(s) shall be analyzed for the presence of all constituents listed in Appendices I and II to 40 CFR para. 258, subpart E, as amended; 56 Fed Reg 51032-51039 (October 9, 1991) by a properly accredited laboratory approved by the city council. The said sample(s) shall be identified by the exact locations from which the sample(s) came, the name and address of the owner(s) of the property from which the sample(s) was/were taken and the name and address of the principal user(s) of the water supply well, if different from the owner, if such a well is located on the property. The results of the analysis/analyses shall be certified by the laboratory and submitted to each property owner from whose property a sample was taken and also to the city council.
15. All new landfills shall be located on a state highway or county primary road, as defined by the Bartow County commissioner, for ingress and egress and on a road which does not create traffic through an area developed primarily for residential purposes. Where necessary, the city council may require the owner/operator to construct or improve a road to accommodate truck traffic necessitated by the operation of the landfill, as a condition of operation and for the purpose of routing traffic around residential areas.
16. Sufficient setback shall be provided from all property lines and public highways to assure adequate lateral support for the maintenance of adjacent properties. No disposal area shall be permitted closer than 1,000 feet from the interior boundary lines of the landfill site. Disposal areas shall at no time be permitted where adjoining lateral support for the maintenance of adjoining land is not maintained.
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.