Skip to content
Georgia Commons
Menu

Emerson · Zoning Ordinance

Appendix A - ZONING / Article VII - REGULATED USES / Division 5 - SOLID WASTE MANAGEMENT FACILITY

Sec. 8.179. Application requirements.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

A. Each person proposing to locate a solid waste management facility within the boundaries of the City of Emerson shall submit an application for determination of plan consistency demonstrating compliance with the provisions contained in this division and consistency with the city's solid waste management plan.

B. Upon enactment of this division, no new landfills shall be operated within the city's limits without a letter of assurance from the city council.

C. Application procedures.

1. An applicant shall prepare and file an application for determination of plan consistency with the city council. The application shall include all related documents submitted to the federal government and to the State of Georgia.

2. The application shall contain the following information:

a. A description of the corporation, its financial capability, and a detailed history of all of its past activities in the field of solid waste management, including a synopsis of every other facility it has operated and including a detailed account of all past and pending litigation, including the outcome of said litigation. Also to be included is information about the record of any subsidiary or parent corporation holding more than five percent of the outstanding shares of the applicant corporation. Also to be included is a list of all past and present litigation in which the subsidiary and/or the parent corporation has been involved.

b. Evidence of liability insurance coverage with minimum limits of $1,000,000.00 for sudden events and $10,000,000.00 for non-sudden events. Such insurance shall cover injury or damage occurring upon the site of the operation and upon properties in the vicinity of the landfill as a result of conditions or activities occurring in connection with the operation of the landfill. An insurance carrier approved by the city council shall issue such policies and such policies shall be filed with the city council. The deductible written into the insurance policy shall not exceed five of the per-incident limit of the liability of the policy. The coverage obtained to fulfill the requirements of this section shall include the provision that the insurer notify the city council 30 days prior to the cancellation of the insurance for any reason. The insured shall provide evidence that $10,000,000.00 liability insurance is to run for five years subsequent to closure of the facility to cover post-closure claims. The insured shall also provide a history of claims against the corporation at any site, including claims against a subsidiary and/or parent corporation.

c. Justification for and anticipated benefits from the facility.

d. A description of the scope of the proposed facility, including an estimated schedule of how much and what kinds of waste the facility would accept, sources of the waste, what pretreatment would be required of wastes unacceptable to the facility without such pretreatment, and how long the facility is expected to be in operation.

e. Yearly site expenses and an estimate of the costs for the lifetime of the facility.

f. The proposed method of financing the facility, including development, operating, and closure stages. Also to be included is the name of the financial institution(s) which will be funding the project.

g. Resumes of management personnel and the proposed number of employees and types of positions, including information about the training and experience required for each position and safety precautions undertaken for the protection of personnel.

h. Anticipated dates to begin construction and to begin operation.

i. A detailed estimate of the types and amounts of local government services required by the operator in each year of operation.

j. A description of emergency procedures and safety and security precautions that will be used in the facility. This information shall include details of emergency assistance and emergency medical treatment that will be required from the area's medical facilities, the Bartow County Rescue Squad and nearby fire departments.

k. A description of the environmental protection measures to be taken by the applicant to prevent contamination in and around the facility site and the description of planned monitoring systems, with an estimated annual budget for each of these items.

l. A description of the environmental protection measures to be used during the transportation of materials to and from the facility, with an estimated annual budget for those arrangements and an estimate of the volume of material to be transported during each year of operation.

m. A description of the site closure plan for the facility, the anticipated date of closure, and the estimated cost of closure, including post-closure costs, if any.

n. A description of anticipated need for post-closure care.

3. A map or other written material attached to the application shall include, but is not limited to the following information.

a. Name, address, and telephone number of the legal owner (and/or agent) of the property on which the facility is to be located;

b. Name, address and telephone number of professional person(s) responsible for the plat of survey.

c. Identification and description of any existing easements or rights-of-way affecting the property.

d. Reference to any restrictive covenants on the property.

e. Description of the property itself, including a location on a property tax map and the parcel number. The description should include reference to a deed book and page number or other evidence of title the current property owner may have.

f. The map shall be drawn to a scale of not more than 200 feet to the inch and shall show the location of the subject property in relation to the immediately surrounding area. Also, the map shall show surrounding property and roads, the names and addresses of adjacent property owners, as indicated by Bartow County tax records, and existing uses of the surrounding property.

g. The map shall contain the graphic scale, date of survey, North arrow and legend.

h. The location of all boundary lines of the property, the total acreage of the land in the project, the location of existing and/or platted streets, easements, buildings, railroads, cemeteries, bridges, sewers, water mains, culverts, wells and gas and electric transmission lines.

i. The location of water bodies, water courses, groundwater aquifers, springs, wetlands, and other related and similar features.

j. The location, dimensions and acreage of all property proposed to be set aside for various uses on the applicant's property.

k. The location of all test wells and/or borings.

l. The location of the 500- and 100-year flood plain and records of flood, including inundation due to dam break.

m. The location of historic properties and grave sites, including any plans to relocate graves or to affect historic properties.

4. A geological map shall also be included in the application. Said map shall show the location of faults, dikes, sills and other pertinent geologic features, including bedrock type and strike and dip of any mappable bedding; the depth and degree of weathering (saprolite); identification and location of clay as to thickness, type and permeability; and location of the water table as to approximate depth, gradient, and surface configuration.

5. A topographic map with contours at vertical intervals of not more than five feet at the same scale as to the project site map. The name of the preparer, date of preparation and the method of preparation shall be included.

6. A transportation route map showing the proposed transportation routes to and from the facility site, including the location of towns and emergency and safety facilities. Also included shall be an estimate of the volume of material to travel on each route.

7. The application shall address the following factors with regard to, but not limited to, on-site storage and/or disposal.

a. Contaminant flow to water table, including leachate monitoring, collecting and withdrawal systems, clay and synthetic liners (extra thickness, multiple liners); spill prevention and control measures.

b. Contaminant movement to groundwater, including groundwater monitoring systems at the site and in potentially affected areas; subsurface "slurry wall" barrier controls and other groundwater withdrawals in the area.

c. Predictability of contaminant movement, based on preconstruction borings and groundwater modeling.

d. Potential effect on surface waters, planned collection systems for surface water runoff, and planned exclusion systems for surface water run-on.

e. Potential effect on aquifers, planned provisions for alternate water supply systems and facilities for immediate pumping and treatment of contaminated water.

f. Potential effect on public water supply, planned runoff collection and treatment and provisions for an alternate supply system.

g. Possibility of site flooding; planned special facility design, special control dikes and buffer zone setback in the area of standard project flood area.

8. In addition to all of the above, the application must show the ability to comply with all the provisions contained in section 2, provision 3B, location standards.

9. The applicant shall provide 15 copies of the application and associated documents to the city council.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:emerson/zoning/8.179@2026-11-11-9de29d6d49

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Emerson Zoning Ordinance, Sec. 8.179. Application requirements | Georgia Commons