A. The application shall contain the following information: 1. A description of the corporation, its financial capability, and a detailed history of all of its past activities in the field of biomedical incineration or biomedical waste disposal, including a synopsis of every other facility it has operated and including a detailed account of all past and pending litigation, including the outcome of said litigation. Also to be included is information about the record of any subsidiary or parent corporation holding more than five percent of the outstanding shares of the applicant corporation. Also to be included is a list of all past and present litigation in which the subsidiary and/or the parent corporation has been involved. 2. The identity of the entity from whom the applicant purchased the incinerator, autoclave, or other equipment, the manufacturer of the equipment, and the contractor(s) responsible for the construction, installation and/or modification of the incinerator, autoclave, or other equipment and air pollution control devices, if any. 3. The applicant shall provide a history of any claims, charges and/or assessments against the applicant involving or arising out of the violation of any local, state, or federal rule or regulation which relates in any way to any biomedical waste incinerator, autoclave, or biomedical waste disposal facility now or formerly owned or operated by the applicant, including biomedical waste incinerator, autoclave, or biomedical waste disposal facility now or formerly owned or operated by any subsidiary or parent corporation of the applicant. 4. Justification for and anticipated benefits from the project. 5. A description of the scope of the proposed project, including an estimated schedule of how much and what kinds of waste the facility will accept, the source(s) of the waste material, how the waste will be handled/stored, what pretreatment will be required of wastes unacceptable to the facility without such pretreatment, and how long the facility is expected to operate. 6. Yearly site expenses and an estimate of the costs for the lifetime of the facility. 7. The proposed method of financing the facility, including development, operating, and closure stages. Also to be included is the name of the financial institution(s) which will be funding the project. 8. Resumes of management personnel and the proposed number of employees and types of positions, including information about the training and experience required for each position and safety precautions undertaken for the protection of personnel. 9. Anticipated dates to begin construction and to begin operation. 10. A detailed estimate of the types and amounts of local government services required by the operator in each year of operation. 11. A description of emergency procedures and safety and security precautions that will be used in the facility. This information shall include details of emergency assistance and emergency medical treatment that will be required from the area's medical facilities, the Bartow County rescue squad and nearby fire departments. 12. A description of the environmental protection measures to be taken by the applicant to prevent contamination in and around the facility site and the description of planned monitoring systems, with an estimated annual budget for each of these items. 13. A description of the environmental protection measures to be used during the transportation of materials to and from the facility, with an estimated annual budget for those arrangements and an estimate of the volume of material to be transported during each year of operation. 14. A description of the site closure plan for the facility, the anticipated date of closure, and the estimated cost of closure, including post-closure costs, if any. 15. A description of anticipated need for post-closure care. 16. A description of the means or method by which to capture any liquid waste, leachate, or runoff from waste feed and ash storage areas as well as areas in which trucks, equipment, containers, and tools that have come into contact with the waste are decontaminated and processed. 17. A detailed emergency plan to address the following issues. Include in the plans, as appropriate and necessary, safety procedures, protective garments, training for employees, back-up and redundant systems, effluent monitoring, automatic shutdown systems. a. Site flooding; b. Potential human exposure to biomedical waste, incinerator ash, wastewater. 18. The planned stack height of the incinerator, provisions for continuous stack monitoring and recording until emission levels are predictable. Also include data on the nature and predictability of pollution movement. 19. How incompatible wastes will be separated and segregated. B. A map, plat, or similar document shall be attached to the application and shall contain the following information. 1. The name, address, and telephone number of the legal owner (and/or agent) of the property on which the facility will be located. 2. Name, address, and telephone number of the professional person responsible for the plat of survey. 3. Description/location of any existing easements or rights-of-way crossing the property. 4. Reference to any existing restrictive covenants on the property. 5. Property tax map parcel number and deed book and page number of recorded deed or other evidence of title the current owner has. 6. The map or plat shall be drawn to a scale of not less than 100 feet to an inch. 7. Location sketch map, showing the relationship of the project to the surrounding area. 8. Graphic scale, date, North arrow, and legend. 9. Surrounding property and roads and the names and addresses of adjacent property owners according to county tax records. 10. Zoning classification of the project and properties adjacent to the project. 11. Boundary lines of the property which shall be not less than 100 acres. 12. Total acreage of land in the project and the location, dimensions, and acreage of all property proposed to be set aside for various uses on the property. 13. The location of existing and/or platted streets, easements, buildings, railroads, cemeteries, bridges, sewers, water mains, culverts, wells and gas and electric transmission lines. 14. The location of water bodies, watercourses, groundwater aquifers, springs, and any other pertinent features. 15. The location of all test wells and/or borings. 16. The location of the 500-year and the 100-year floodplains and records of flood, including inundation due to dam break. 17. No facility shall be located within 1,000 feet of any exterior boundary line. Such 1,000-foot buffer shall remain in its natural vegetative state. Any facility shall be completely fenced with chain link material eight feet in height as measured from the ground and topped with three strands of barbed wire angled at 45 degrees toward the outside of the site. All entrances to the sites shall have an eight-foot high gate which shall be closed at all times the facility is not open. C. A topographic map (topo) shall be attached to the application. The topo shall show contours at vertical intervals of not more than ten feet; the scale of the topo shall be the same as that used for the project site map. The date and method of preparation shall be shown on the topo as well as the preparer of the topo. D. A transportation route map shall also be attached to the application. Such map shall show the proposed transportation routes to and from the facility, including the location of towns and emergency and safety facilities. For each transportation route, an estimate of volume of material to be transported to the facility. E. The owner/operator shall provide 15 copies of the application and all associated documents to the city council.