Skip to content
Georgia Commons
Menu

Euharlee · Zoning Ordinance

Appendix A - ZONING / Article V - GENERAL PROVISIONS

Sec. 5.16. Stream buffers/state waters buffer.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

An undisturbed vegetative buffer is required for any state waters, as such term is defined in O.C.G.A. § 12-7-3. Such buffer is to be a minimum of fifty (50) feet on each side of the state waters, as measured horizontally either from the top of the stream bank, or from the point where vegetation has been wrested by normal stream flow or wave action, whichever provides a larger buffer. For state waters that are not streams, the buffer is measured from the top of the bank or edge of the high-water mark, whichever is higher. Access points to the stream for livestock watering shall be allowed, but must be constructed following Best Management Practices (BMPs) to minimize pollution and sedimentation to the stream or river. A further twenty-five (25) foot setback buffer is imposed outside the 50-foot buffer; in the setback buffer, no impervious surfaces (including driveways, walkways, patios, other paving, etc.), nor septic tanks, septic drain fields or similar disposal systems, may be placed. Grading, filling, and earthmoving shall be minimized within the setback buffer. Any unauthorized disturbance of the buffer during construction must be restored to a vegetative density similar to the adjacent buffer areas, and also constitutes a violation of this Ordinance. Variances shall be granted under Article XIV.

Any permit applications for property requiring buffers and setback buffers under this section must include all information requested by the Zoning Administrator to insure compliance with this section, with the following as a minimum: a site plan showing: the location of all streams on the property, the limits of required stream buffers and setbacks on the property, buffer zone topography with contour lines at no greater than five (5)-foot contour intervals; delineation of forested and open areas in the buffer zone, and detailed plans of all proposed land development in the buffer and of all proposed impervious cover within the setback.

Additionally, a description of all proposed land development within the buffer and setback is required.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:euharlee/zoning/5.16@2026-11-11-1de80168b0

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Euharlee Zoning Ordinance, Sec. 5.16. Stream buffers/state waters buffer | Georgia Commons