A temporary construction entrance and exit must be installed and maintained for any land disturbance or other construction occurring in the City. Such exit must be maintained while any construction and/or grading equipment will be leaving a construction site to a public right-of-way, street, or parking area until construction is completed. (The construction entrance and exit may be the same as the driveway exit.) 6.28.1 The pad shall be adequate to substantially eliminate the transport of mud from the construction site by either motor vehicles or equipment or from water run-off. 6.28.2 Any materials or mud spilled, dropped, washed, or tracked from vehicles or from the site onto roadways or into storm drains must be removed within 24 hours or the City may perform any necessary corrective work and the owner/developer shall reimburse the City for any expenses incurred. In the event the City undertakes the corrective work, no building permits for said development shall be issued until said expenses have been reimbursed to the City. 6.28.3 The entrance and exit pad of gravel or stone must be at least twelve (12) feet in width by twenty (20) feet in length with a depth of four (4) inches, and a geo-textile pad underneath. The pad may be required to be an additional width, length, and/or depth if, in the opinion of the City, conditions so warrant. 6.28.4 In addition, construction sites other than one- and two-family dwellings must comply with the Euharlee Soil and Erosion Ordinance.