Skip to content
Georgia Commons
Menu

Fairburn · Zoning Ordinance

Part II - LAND DEVELOPMENT AND RELATED REGULATIONS / Chapter 80 - ZONING / Article IV - ADMINISTRATIVE PERMITS AND USE PERMITS

Sec. 80-220. Landfill, solid waste disposal.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Allowable district: M-2.

(b) Standards:

(1) No access shall be allowed from local streets.

(2) Access streets shall be paved and shall be able to withstand maximum load limits established by the state as approved by

the director of public works.

(3) No portion of a new landfill shall be located within a three-mile radius of the property lines of an existing landfill.

(4) The waste disposal boundary of a landfill shall be located at least 500 feet from all property lines, except adjacent to M-1

(light industrial) and M-2 (heavy industrial) zoned districts.

(5) A minimum 200-foot buffer and ten-foot improvement setback shall be required

along all property lines except public rights-of-way.

(6) A minimum 50-foot buffer and ten-foot improvement setback shall be required

along all public rights-of-way.

(7) A minimum six-foot high solid fence or wall shall be located on property lines or interior to the required buffers and

improvement setbacks.

(8) Limit hours of operation from 6:00 a.m.

to 6:00 p.m., Monday through Saturday.

(9) The owner shall provide the director of planning a current copy of all applicable permits from the state department of

natural resource upon application for a land disturbance permit.

(10) Vehicles shall be allowed into a landfill site only if waste is covered to prevent blowing of material from the vehicle.

(11) No portion of a new or expanded landfill shall be located within a one-mile radius of the property lines of a residentially zoned or used property.

(12) An expanded landfill shall not include any expanded use within the parcel

boundaries of an existing site or location.

(13) The landfill shall be sited and operated in accordance with the Rules of Georgia, Department of Natural Resources,

Environmental Protection Division, Comprehensive Solid Waste Management Plan, and 40 CFR Part 258 (Subtitle D of RCRA).

(Ord. No. 2012-04, § 1(Exh. A), 6-11-2012; Ord.

of 10-28-2019(1))

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:fairburn/zoning/80-220@2026-11-11-c30c90af68

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Fairburn Zoning Ordinance, Sec. 80-220. Landfill, solid waste disposal | Georgia Commons