Fairburn · Zoning Ordinance
Part II - LAND DEVELOPMENT AND RELATED REGULATIONS / Chapter 80 - ZONING / Article IV - ADMINISTRATIVE PERMITS AND USE PERMITS
Sec. 80-228. Recycling center, processing.
About this text
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(a) Allowable district: M-2.
(b) Standards:
(1) Limit hours of operation from 7:00 a.m.
to 8:00 p.m. Monday through Saturday.
(2) No portion of a new recycling facility shall be located within a three-mile radius of the property lines of an existing
recycling facility.
(3) A minimum 200-foot buffer and ten-foot improvement setback shall be required
along all property lines except public rights-of-way.
(4) A minimum 50-foot buffer and ten-foot improvement setback shall be required
along all public rights-of-way.
(5) All recyclable materials shall be stored in containers with no stockpiling outside the containers.
(6) Collection, storage containers, or receptacles shall not be allowed in minimum yards. Storage shall be screened with a six-foot high, solid wall or fence, including access gates.
(7) The processing of recyclable materials must be done within an enclosed building.
(8) Driveways shall be designed so vehicles will exit the facility in a forward direction.
(9) A maximum continuous sound level of 65 dBA and a maximum peak sound level of
75 dBA shall not be exceeded at property lines of adjacent residential districts
and/or the AG districts used for single family.
(10) The recycling center shall comply with regulations administered by the county
department of health.
(Ord. No. 2012-04, § 1(Exh. A), 6-11-2012; Ord.
of 10-28-2019(1))
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.